5414 Avenue G
Austin, TX 78751
5414 Avenue G: 1 project on record
City of Austin lists 1 filing across 1 project at 5414 Avenue G, Austin, TX 78751. The most recent, filed July 29, 2024, covers: “Install evse”.
Compiled from City of Austin records · updated Jul 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 29, 2024
- since Jul 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall evse
- AppliedJul 22, 2024
- IssuedJul 29, 2024
- WorkJul '24 – Jan '25
- Final inspectionJul 29, 2024
Passed final inspection Jul 29, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall evse
Install evse
City of Austin permitElectrical PermitFinal- Record
- 2024-090231 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5414 Avenue G
What is being built at 5414 Avenue G?
The latest filing (City of Austin permit 2024-090231 EP, July 29, 2024) covers install evse.
How many permits and filings does 5414 Avenue G have?
1 filing across 1 project, from July 29, 2024 to July 29, 2024.
Is there other construction near 5414 Avenue G?
Yes. Nearby filings include 5500 Avenue G (replacing a 25 feet underground gas line from the meter, Dec 4, 2023); 5413 Avenue G (reroute washer drain from current location to new location as well as rerouting gas lines from dryer to new laundry room location 5413 avenue g austin tx 78751, Jul 23, 2025); 5411 Avenue G (construct new driveway approach of 12 ft. no sidewalk inspection per plan review, Jun 18, 2024).
How do I get alerts for new permits at 5414 Avenue G?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78751- 5500 Avenue GDec 4, 2023Replacing a 25 feet underground gas line from the meter · 33 m away
- 5413 Avenue GJul 23, 2025Reroute washer drain from current location to new location as well as rerouting gas lines from dryer to new laundry room location 5413 avenue g austin tx 78751 · 43 m away
- 5411 Avenue GJun 18, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 52 m away
- 5409 Avenue GJun 18, 2024Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 54 m away
- 5406 Avenue GJul 10, 2024Install electric range circuit · 59 m away
- 5503 Avenue GApr 17, 2026Express: remove and replace 9 windows (like for like) · 62 m away
- 5409 Avenue FJul 11, 2024Addition to existing 2-story single family residential to include: converting existing uncovered balcony to enclosed sunroom above existing garage · 71 m away
- 5405 Avenue FJan 22, 2024Install solar system at residence. the power generated by the pv system will be interconnected with the utility grid through a breaker on the iq controller. the pv system includes 15kwh of battery storage · 92 m away
- 5508 Avenue GJun 5, 2026Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 5507 Avenue FAug 5, 2026Arneson - 39-96024 install new 3.8kw rooftop solar system to existing residential only using backfed breaker only · 95 m away
- 5414 Avenue FNov 18, 2024Irrigation installation · 97 m away
- 5412 Avenue FJun 4, 2024Express: replace 5 windows like for like · 100 m away