105 W Lisa Dr
Austin, TX 78752
105 W Lisa Dr: 4 projects on record
City of Austin lists 4 filings across 4 projects at 105 W Lisa Dr, Austin, TX 78752 since March 4, 2024. The most recent, filed August 19, 2024, covers: “Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest”.
Compiled from City of Austin records · updated Aug 19, 2024
- Projects
- 4
- 4 filings
- Latest filing
- Aug 19, 2024
- since Mar 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledKitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
- AppliedMar 20, 2023
- IssuedAug 19, 2024
- WorkAug '24 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
4 projectsKitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
City of Austin permitMechanical PermitFinal- Record
- 2023-037717 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
City of Austin permitPlumbing PermitFinal- Record
- 2023-037717 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest. update main electrical panel/upgrade service
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest. update main electrical panel/upgrade service
City of Austin permitElectrical PermitFinal- Record
- 2023-037717 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest
City of Austin permitBuilding PermitFinal- Record
- 2023-037717 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 105 W Lisa Dr
What is being built at 105 W Lisa Dr?
The latest filing (City of Austin permit 2023-037717 MP, August 19, 2024) covers kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest.
How many permits and filings does 105 W Lisa Dr have?
4 filings across 4 projects, from March 4, 2024 to August 19, 2024.
Is there other construction near 105 W Lisa Dr?
Yes. Nearby filings include 104 W Lisa Dr (replace weathered service like for like, Feb 15, 2024); 7012 Rufus Dr (excavate 3 tunnel to repair drain line serving washing machine excavate an additional 20 to repair main drain line serving the kitchen, Jul 11, 2025); 101 W Lisa Dr (upgrade service and meter to 200a, Jun 12, 2026).
How do I get alerts for new permits at 105 W Lisa Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 104 W Lisa DrFeb 15, 2024Replace weathered service like for like · 47 m away
- 7012 Rufus DrJul 11, 2025Excavate 3 tunnel to repair drain line serving washing machine excavate an additional 20 to repair main drain line serving the kitchen · 47 m away
- 101 W Lisa DrJun 12, 2026Upgrade service and meter to 200a · 48 m away
- 102 W Lisa DrApr 24, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 4.2 · 60 m away
- 7010 Miranda DrSep 30, 202640 sewer line replacement · 70 m away
- 100 W Lisa DrJan 24, 2024Install roof-mounted solar and energy storage system to existing residence · 75 m away
- 7008 Miranda DrJul 1, 2024Express: tub to shower conversion replace sewer line under house (cast iron to pvc) · 84 m away
- 201 W St Johns AveMar 22, 2024150-amp overhead service rebuild · 93 m away
- 7009 Isabelle DrJan 15, 2025Replace burnt meter lugs on b phase · 111 m away
- 7009 Miranda DrJun 11, 2026Upgrade/ change electrical service 200 amp panel and meter base · 116 m away
- 7004 Miranda DrFeb 16, 2024Tunnel below the foundation to repair drain lines · 117 m away
- 7010 Isabelle DrMar 18, 2026Garage conversion - garage conversion to master bedroom. adding one bedroom and one full bathroom to downstairs garage enclosure · 134 m away
More restaurants in 78752.