7008 Miranda Dr
Austin, TX 78752
7008 Miranda Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7008 Miranda Dr, Austin, TX 78752 since June 17, 2024. The most recent, filed July 1, 2024, covers: “Express: tub to shower conversion replace sewer line under house (cast iron to pvc)”.
Compiled from City of Austin records · updated Jul 1, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jul 1, 2024
- since Jun 17, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: tub to shower conversion replace sewer line under house (cast iron to pvc)
- AppliedJun 17, 2024
- IssuedJul 1, 2024
- WorkJul '24 – Aug '24
- Final inspectionAug 29, 2024
Passed final inspection Aug 29, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExpress: tub to shower conversion replace sewer line under house (cast iron to pvc)
Express: tub to shower conversion replace sewer line under house (cast iron to pvc)
City of Austin permitPlumbing PermitFinal- Record
- 2024-075833 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: tub to shower conversion replace sewer line under house (cast iron to pvc)
Express: tub to shower conversion replace sewer line under house (cast iron to pvc)
City of Austin permitBuilding PermitFinal- Record
- 2024-075833 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 7008 Miranda Dr
What is being built at 7008 Miranda Dr?
The latest filing (City of Austin permit 2024-075833 PP, July 1, 2024) covers express: tub to shower conversion replace sewer line under house (cast iron to pvc).
How many permits and filings does 7008 Miranda Dr have?
2 filings across 2 projects, from June 17, 2024 to July 1, 2024.
Is there other construction near 7008 Miranda Dr?
Yes. Nearby filings include 7010 Miranda Dr (40 sewer line replacement, Sep 30, 2026); 7004 Miranda Dr (tunnel below the foundation to repair drain lines, Feb 16, 2024); 7009 Miranda Dr (upgrade/ change electrical service 200 amp panel and meter base, Jun 11, 2026).
How do I get alerts for new permits at 7008 Miranda Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7010 Miranda DrSep 30, 202640 sewer line replacement · 17 m away
- 7004 Miranda DrFeb 16, 2024Tunnel below the foundation to repair drain lines · 40 m away
- 7009 Miranda DrJun 11, 2026Upgrade/ change electrical service 200 amp panel and meter base · 43 m away
- 7005 Miranda DrJul 7, 2026Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 7002 Miranda DrSep 14, 2026Installing outlet for tankless wh · 60 m away
- 101 W Lisa DrJun 12, 2026Upgrade service and meter to 200a · 66 m away
- 105 W Lisa DrAug 19, 2024Kitchen remodel replaces appliances sink and cabinetry adds new lighting and electrical outlets and may require moving a gas line from a wall to an island (if we cant convert gas cooking to induction/convection). 2 bathroom remodels will replace all fixtures and tile surrounds. replacing flooring in most rooms and raising one floor to be level with the rest · 84 m away
- 7001 Rufus DrJan 24, 2025Replacing a section of cast iron · 94 m away
- 7012 Rufus DrJul 11, 2025Excavate 3 tunnel to repair drain line serving washing machine excavate an additional 20 to repair main drain line serving the kitchen · 97 m away
- 102 W Lisa DrApr 24, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 4.2 · 106 m away
- 100 W Lisa DrJan 24, 2024Install roof-mounted solar and energy storage system to existing residence · 107 m away
- 104 W Lisa DrFeb 15, 2024Replace weathered service like for like · 109 m away