2006 Sandberg Dr
Austin, TX 78752
2006 Sandberg Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2006 Sandberg Dr, Austin, TX 78752. The most recent, filed November 11, 2024, covers: “Kinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed”.
Compiled from City of Austin records · updated Nov 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 11, 2024
- since Nov 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledKinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed
- AppliedOct 31, 2024
- IssuedNov 11, 2024
- WorkNov '24 – Nov '24
- Final inspectionNov 15, 2024
Passed final inspection Nov 15, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectKinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed
Kinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed
City of Austin permitPlumbing PermitFinal- Record
- 2024-146146 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2006 Sandberg Dr
What is being built at 2006 Sandberg Dr?
The latest filing (City of Austin permit 2024-146146 PP, November 11, 2024) covers kinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed.
How many permits and filings does 2006 Sandberg Dr have?
1 filing across 1 project, from November 11, 2024 to November 11, 2024.
Is there other construction near 2006 Sandberg Dr?
Yes. Nearby filings include 7600 Hemingway (4 ton heat pump condenser change-out & 88k btus air handler change-out, Aug 14, 2026); 7522 Hemingway (replacement of complete existing central heat and air system with or without duct work, Jul 31, 2026); 7520 Hemingway (disconnect for waterheater, Jun 18, 2024).
How do I get alerts for new permits at 2006 Sandberg Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 7600 HemingwayAug 14, 20264 ton heat pump condenser change-out & 88k btus air handler change-out · 66 m away
- 7522 HemingwayJul 31, 2026Replacement of complete existing central heat and air system with or without duct work · 69 m away
- 7520 HemingwayJun 18, 2024Disconnect for waterheater · 82 m away
- 7509 Brookhollow DrApr 30, 2026Replacement of complete existing central heat and air system with or without duct work · 93 m away
- 7508 HemingwayMar 23, 2026Express - remodel 2 bathrooms replace tub toilet cabinets mirrors and lighting fixtures. replace kitchen counter and paint cabinets. floor plan remains the same · 137 m away
- 2003 Millay DrMar 13, 2025Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 2009 Millay DrAug 26, 2026Express- remove and replace 8 windows like for like no structural changes · 145 m away
- 2101 Kippling DrJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 149 m away
- 7504 Brookhollow DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 153 m away
- 2105 Kippling DrJun 17, 2024Permission to disconnect the meter and need approximately 5 hours to replace main panel · 153 m away
- 7409 Brookhollow DrNov 18, 2026Installed tankless water heater · 160 m away
- 1719 Pebble Brook DrDec 12, 2023Existing meter can failed and needs replaced on an occupied structure · 179 m away