500 St Johns Ave
Austin, TX 78752
Site-plan improvements approved for Austin Stone in 2026
A site-plan case for The Austin Stone Improvements at 500 St Johns Ave was approved and released on May 13, 2026. The City of Austin record does not specify the scope, size or cost of the improvements.
Summarized from City of Austin records · updated May 13, 2026
- Projects
- 7
- 7 filings
- Latest filing
- May 13, 2026
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
7 projectsSources: City of Austin
Questions about 500 St Johns Ave
What is happening at 500 St Johns Ave in Austin?
A City of Austin site-plan case named The Austin Stone Improvements was approved and released on May 13, 2026. The record does not describe the specific work.
When was the project at 500 St Johns Ave approved?
The site-plan case, number 13463229, was approved and released on May 13, 2026.
What is the Austin Stone Improvements project?
It is the name of a site-plan case at 500 St Johns Ave. The available record does not provide details about the improvements.
Is 500 St Johns Ave associated with Austin Stone Community Church?
City of Austin records include earlier site-plan cases named Austin Stone Community Church at this address, approved and released in 2013 and 2014. The latest case is titled The Austin Stone Improvements.
How much will the improvements at 500 St Johns Ave cost?
The available City of Austin record does not report a project cost or valuation.
How large is the project at 500 St Johns Ave?
The record does not list a project area or building square footage.
Also being built nearby
All of 78752- 7200 Duval StJun 20, 2024Replace 7 overhead service risers for building 1 · 31 m away
- 7202 Twin Crest DrMar 2, 2007Child, inc. --twin crest daycare · 67 m away
- 7304 Duval StMar 19, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 109 m away
- 7306 Duval StJan 10, 2025Emergency permit - repair burnt wire on load side · 131 m away
- 7302 Twin Crest DrMay 19, 2026Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 7205 Eastcrest DrSep 11, 2026Replacement of complete existing central heat and air system with or without duct work 4 ton condenser change-out & 88k btus furnace change-out · 133 m away
- 7209 Eastcrest DrJun 26, 2024***new solar panels on new solar system*** installation of solar panels on existing residential roof. 5.04 kw · 161 m away
- 204 E Lisa DrNov 13, 2025Replacement of complete existing central heat and air system with or without duct work · 172 m away
- 111 E St Johns AveApr 1, 2024Express: replace water heater replace hvac system replace siding in back of home (2nd floor) · 174 m away
- 211 E Lisa DrAug 21, 2025Replacement of complete existing central heat and air system with or without duct work · 178 m away
- 209 E Lisa DrMay 21, 2025Replacement of an existing water heater · 180 m away
- 300 Croslin StApr 29, 2026300 east croslin street multi-family addition · 184 m away