5810 Link Ave
Austin, TX 78752
5810 Link Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 5810 Link Ave, Austin, TX 78752. The most recent, filed March 11, 2026, covers: “Replacement of mini-split system ducted minisplit no actual ductwork”.
Compiled from City of Austin records · updated Mar 11, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Mar 11, 2026
- since Mar 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsReplacement of mini-split system ducted minisplit no actual ductwork
Replacement of mini-split system ducted minisplit no actual ductwork
City of Austin permitMechanical PermitFinal- Record
- 2026-029219 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: remove and replace siding like for like
Express: remove and replace siding like for like
City of Austin permitBuilding PermitExpired- Record
- 2023-121721 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5810 Link Ave
What is being built at 5810 Link Ave?
The latest filing (City of Austin permit 2026-029219 MP, March 11, 2026) covers replacement of mini-split system ducted minisplit no actual ductwork.
How many permits and filings does 5810 Link Ave have?
2 filings across 2 projects, from March 11, 2026 to March 11, 2026.
Is there other construction near 5810 Link Ave?
Yes. Nearby filings include 105 W Skyview Rd (install evse, Jul 30, 2024); 100 W Skyview Rd (cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Apr 29, 2025); 102 W Skyview Rd (replacement of complete existing central heat and air system with or without duct work, Aug 7, 2024).
How do I get alerts for new permits at 5810 Link Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 105 W Skyview RdJul 30, 2024Install evse · 59 m away
- 100 W Skyview RdApr 29, 2025Cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 68 m away
- 102 W Skyview RdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 74 m away
- 5802 Link AveJun 25, 2025Install electric circuit for range · 77 m away
- 5717 Avenue DFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 5800 Link AveAug 15, 2025Express: foundation repair · 95 m away
- 5801 Link AveApr 18, 2024Replacement of an existing water heater · 97 m away
- 5714 Avenue DNov 25, 2024Express: change windows replace like for like · 97 m away
- 108 W Skyview RdOct 23, 2026Interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt · 103 m away
- 108 E Skyview RdJan 24, 2025Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 110 W Skyview RdApr 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system · 115 m away
- 5804 Chesterfield AveAug 12, 2025Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time · 118 m away