5804 Chesterfield Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 5804 Chesterfield Ave, Austin, TX 78752. The most recent, filed August 12, 2025, covers: “Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time”.
Compiled from City of Austin records · updated Aug 12, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 12, 2025
- since Aug 12, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledBathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time
- AppliedAug 8, 2025
- IssuedAug 12, 2025
- WorkAug '25 – Aug '25
- Final inspectionAug 27, 2025
Passed final inspection Aug 27, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectBathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time
Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time
City of Austin permitPlumbing PermitFinal- Record
- 2025-100613 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5804 Chesterfield Ave
What is being built at 5804 Chesterfield Ave?
The latest filing (City of Austin permit 2025-100613 PP, August 12, 2025) covers bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time.
How many permits and filings does 5804 Chesterfield Ave have?
1 filing across 1 project, from August 12, 2025 to August 12, 2025.
Is there other construction near 5804 Chesterfield Ave?
Yes. Nearby filings include 5802 Chesterfield Ave (replacement of an existing water heater tankless water heater swap (like for like), May 19, 2026); 105 W Skyview Rd (install evse, Jul 30, 2024); 300 W Skyview Rd (remodel existing shed existing wall to remain all others to be demolished, Jan 27, 2026).
How do I get alerts for new permits at 5804 Chesterfield Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 5802 Chesterfield AveMay 19, 2026Replacement of an existing water heater tankless water heater swap (like for like) · 17 m away
- 105 W Skyview RdJul 30, 2024Install evse · 74 m away
- 300 W Skyview RdJan 27, 2026Remodel existing shed existing wall to remain all others to be demolished · 75 m away
- 110 W Skyview RdApr 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system · 79 m away
- 108 W Skyview RdOct 23, 2026Interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt · 86 m away
- 5714 Avenue DNov 25, 2024Express: change windows replace like for like · 96 m away
- 5718 Chesterfield AveFeb 23, 2026Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 5810 Link AveMar 11, 2026Replacement of mini-split system ducted minisplit no actual ductwork · 118 m away
- 102 W Skyview RdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 124 m away
- 100 W Skyview RdApr 29, 2025Cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 137 m away
- 5717 Avenue DFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 5707 Chesterfield AveJan 21, 2026Rebuild service. meter base and riser · 148 m away