300 W Skyview Rd
Austin, TX 78752
Existing shed remodel at 300 W Skyview Rd
Permits indicate an existing shed at 300 W Skyview Rd is being remodeled, with one wall remaining and the others to be demolished. The City of Austin issued a building permit on October 15, 2025, and an electrical permit on January 27, 2026; both are listed as final.
Summarized from City of Austin records · updated Jan 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 27, 2026
- since Oct 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRemodel existing shed existing wall to remain all others to be demolished
- AppliedApr 7, 2025
- IssuedJan 27, 2026
- WorkJan '26 – Apr '26
- Final inspectionApr 10, 2026
Passed final inspection Apr 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRemodel existing shed existing wall to remain all others to be demolished
Remodel existing shed existing wall to remain all others to be demolished
City of Austin permitElectrical PermitFinal- Record
- 2025-116846 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Remodel existing shed existing wall to remain all others to be demolished
Remodel existing shed existing wall to remain all others to be demolished
City of Austin permitBuilding PermitFinal- Record
- 2025-116846 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 300 W Skyview Rd
What is being built at 300 W Skyview Rd in Austin?
City permits indicate a remodel of an existing shed, with one wall to remain and the others to be demolished.
Is a new building planned at 300 W Skyview Rd?
The records describe a remodel of an existing shed, not a new building.
When was the shed remodel permitted?
The City of Austin issued building permit 2025-116846 BP on October 15, 2025, and electrical permit 2025-116846 EP on January 27, 2026. Both are listed as final.
What work is planned for the shed at 300 W Skyview Rd?
The permit descriptions say the existing shed will be remodeled, one wall will remain, and all other walls will be demolished.
What is being remodeled near Austin Independent School District on Denson Drive?
Permits at 300 W Skyview Rd, about 254 meters from Austin Independent School District at 405 Denson Dr, indicate a remodel of an existing shed.
Also being built nearby
All of 78752- 110 W Skyview RdApr 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system · 19 m away
- 108 W Skyview RdOct 23, 2026Interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt · 36 m away
- 105 W Skyview RdJul 30, 2024Install evse · 73 m away
- 5804 Chesterfield AveAug 12, 2025Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time · 75 m away
- 102 W Skyview RdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 5802 Chesterfield AveMay 19, 2026Replacement of an existing water heater tankless water heater swap (like for like) · 92 m away
- 100 W Skyview RdApr 29, 2025Cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 109 m away
- 5901 Dillard CirSep 25, 2013Reilly pond detention performance modifications project · 123 m away
- 5810 Link AveMar 11, 2026Replacement of mini-split system ducted minisplit no actual ductwork · 131 m away
- 5714 Avenue DNov 25, 2024Express: change windows replace like for like · 159 m away
- 5718 Chesterfield AveFeb 23, 2026Replacement of complete existing central heat and air system with or without duct work · 186 m away
- 5717 Avenue DFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 195 m away