5901 Dillard Cir
Austin, TX 78752
5901 Dillard Cir: 1 project on record
City of Austin lists 1 filing across 1 project at 5901 Dillard Cir, Austin, TX 78752. The most recent, filed September 25, 2013, covers: “Reilly pond detention performance modifications project”.
Compiled from City of Austin records · updated Sep 25, 2013
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2013
- since Sep 25, 2013
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 5901 Dillard Cir
What is being built at 5901 Dillard Cir?
The latest filing (City of Austin case 10944793, September 25, 2013) covers reilly pond detention performance modifications project.
How many permits and filings does 5901 Dillard Cir have?
1 filing across 1 project, from September 25, 2013 to September 25, 2013.
What is being built near Austin Independent School District in Austin?
5901 Dillard Cir is about 211 m from Austin Independent School District (405 Denson Dr). Its latest filing is for reilly pond detention performance modifications project.
Is there other construction near 5901 Dillard Cir?
Yes. Nearby filings include 102 W Skyview Rd (replacement of complete existing central heat and air system with or without duct work, Aug 7, 2024); 100 W Skyview Rd (cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Apr 29, 2025); 108 W Skyview Rd (interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt, Oct 23, 2026).
How do I get alerts for new permits at 5901 Dillard Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 102 W Skyview RdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 100 W Skyview RdApr 29, 2025Cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 102 m away
- 108 W Skyview RdOct 23, 2026Interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt · 104 m away
- 110 W Skyview RdApr 8, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system · 112 m away
- 300 W Skyview RdJan 27, 2026Remodel existing shed existing wall to remain all others to be demolished · 123 m away
- 105 W Skyview RdJul 30, 2024Install evse · 138 m away
- 5925 Dillard CirSep 6, 2007Trinity hardwoods industrial · 155 m away
- 108 E Skyview RdJan 24, 2025Replacement of complete existing central heat and air system with or without duct work · 157 m away
- 5810 Link AveMar 11, 2026Replacement of mini-split system ducted minisplit no actual ductwork · 168 m away
- 5804 Chesterfield AveAug 12, 2025Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time · 190 m away
- 109 Denson DrNov 4, 2026Replace unit b meter socket due to thermal damage · 190 m away
- 5802 Chesterfield AveMay 19, 2026Replacement of an existing water heater tankless water heater swap (like for like) · 206 m away