110 W Skyview Rd
Austin, TX 78752
110 W Skyview Rd: 1 project on record
City of Austin lists 1 filing across 1 project at 110 W Skyview Rd, Austin, TX 78752. The most recent, filed April 8, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system”.
Compiled from City of Austin records · updated Apr 8, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 8, 2025
- since Apr 8, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system
- AppliedApr 4, 2025
- IssuedApr 8, 2025
- WorkApr '25 – Aug '25
- Final inspectionAug 22, 2025
Passed final inspection Aug 22, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system
Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system
City of Austin permitMechanical PermitFinal- Record
- 2025-040958 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 110 W Skyview Rd
What is being built at 110 W Skyview Rd?
The latest filing (City of Austin permit 2025-040958 MP, April 8, 2025) covers replacement of complete existing central heat and air system with or without duct work hvac changeout - replace current system with new 3 ton single stage goodman system.
How many permits and filings does 110 W Skyview Rd have?
1 filing across 1 project, from April 8, 2025 to April 8, 2025.
Is there other construction near 110 W Skyview Rd?
Yes. Nearby filings include 108 W Skyview Rd (interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt, Oct 23, 2026); 300 W Skyview Rd (remodel existing shed existing wall to remain all others to be demolished, Jan 27, 2026); 105 W Skyview Rd (install evse, Jul 30, 2024).
How do I get alerts for new permits at 110 W Skyview Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 108 W Skyview RdOct 23, 2026Interior renovations - add a half bathroom replace all cabinets & countertops replace electrical panel install new hvac system with ducting install new flooring paint interior & exterior including interior drywall repairs relocate washer & dryer connections in laundry room - add a door leading to laundry room & a sliding door leading to backyard replace existing tub & tile - install new plumbing fixtures ***modifying existing electrical service to add disconnect means-hyatt · 17 m away
- 300 W Skyview RdJan 27, 2026Remodel existing shed existing wall to remain all others to be demolished · 19 m away
- 105 W Skyview RdJul 30, 2024Install evse · 58 m away
- 102 W Skyview RdAug 7, 2024Replacement of complete existing central heat and air system with or without duct work · 72 m away
- 5804 Chesterfield AveAug 12, 2025Bathroom replumb leak repair under pier and beam home issue: a leak has been identified in the cast iron sewer stack beneath the pier and beam home specifically at the section of pipe just before it penetrates the subfloor. cause: the existing plumbing configuration as originally installed ties both the toilet and tub into the same leaking stack. due to this setup and the condition of the materials a full replumb of the bathroom drain system is necessary. work to be performed: all existing cast iron piping serving the bathroom will be cut out and completely removed. the entire bathroom drain system will be replumbed using new pvc sewer piping. new pvc lines will be securely strapped to the underside of the subfloor to ensure long-term stability and to prevent shifting or sagging over time · 79 m away
- 100 W Skyview RdApr 29, 2025Cap off water wastewater permit total demolition of single-story sfr 1118 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 90 m away
- 5802 Chesterfield AveMay 19, 2026Replacement of an existing water heater tankless water heater swap (like for like) · 95 m away
- 5901 Dillard CirSep 25, 2013Reilly pond detention performance modifications project · 112 m away
- 5810 Link AveMar 11, 2026Replacement of mini-split system ducted minisplit no actual ductwork · 115 m away
- 5714 Avenue DNov 25, 2024Express: change windows replace like for like · 152 m away
- 108 E Skyview RdJan 24, 2025Replacement of complete existing central heat and air system with or without duct work · 181 m away
- 5717 Avenue DFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 184 m away