7424 US 290 Hwy Svrd
Austin, TX 78752
7424 US 290 Hwy Svrd: 2 projects on record
City of Austin lists 2 filings across 2 projects at 7424 US 290 Hwy Svrd, Austin, TX 78752 since April 3, 2019. The most recent, filed January 21, 2022, covers: “Austin achieve”.
Compiled from City of Austin records · updated Jan 21, 2022
- Projects
- 2
- 2 filings
- Latest filing
- Jan 21, 2022
- since Apr 3, 2019
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 7424 US 290 Hwy Svrd
What is being built at 7424 US 290 Hwy Svrd?
The latest filing (City of Austin case 11670602, January 21, 2022) covers austin achieve.
How many permits and filings does 7424 US 290 Hwy Svrd have?
2 filings across 2 projects, from April 3, 2019 to January 21, 2022.
Is there other construction near 7424 US 290 Hwy Svrd?
Yes. Nearby filings include 2315 E Anderson Ln Svrd Eb (remove/replace existing roof system as required and install new tpo roofing system. no structural work. no insulation work no changes to the pitch, Sep 9, 2026); 2315 Anderson Ln (comerica bank, Mar 2, 2007); 7411 Geneva Dr (290 geneva medical office buildings, Apr 24, 2024).
How do I get alerts for new permits at 7424 US 290 Hwy Svrd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78752- 2315 E Anderson Ln Svrd EbSep 9, 2026Remove/replace existing roof system as required and install new tpo roofing system. no structural work. no insulation work no changes to the pitch · 182 m away
- 2315 Anderson LnMar 2, 2007Comerica bank · 191 m away
- 7411 Geneva DrApr 24, 2024290 geneva medical office buildings · 243 m away
- 7406 Geneva DrMay 23, 2023Neises subdivision · 302 m away
- 7304 Middlebury CvSep 6, 2024Install level 2 ev charger · 311 m away
- 7305 Middlebury CvJan 8, 2025200 amp service rebuild riser meter. the home has a barn style shaped roof and eve is 10 6 off grade to raise new riser to 12 6 will take rise to the right and 90 up and support riser with either carriage bolts supported through framing in bedroom upstairs or build strut rack lag bolted through bottom of eve. one line drawings for reference need ae spot to approve riser location · 322 m away
- 2105 Kippling DrJun 17, 2024Permission to disconnect the meter and need approximately 5 hours to replace main panel · 332 m away
- 7319 Geneva DrApr 3, 2026Replacement of complete existing central heat and air system with or without duct work · 333 m away
- 2006 Sandberg DrNov 11, 2024Kinsey will be tunneling under home and replacing a 20ft section of the main building drain. we will be installing new schedule 40 pvc every 6 ft hangers and have an engineer report completed · 335 m away
- 2101 Kippling DrJun 26, 2025Replacement of complete existing central heat and air system with or without duct work · 343 m away
- 7304 Blinn CirJun 28, 2024Replacement of complete existing central heat and air system with or without duct work · 347 m away
- 7404 Charlton DrSep 7, 2026Base: installing a backup battery system and additional meter socket · 357 m away