1007 Salem Ln
Austin, TX 78753
1007 Salem Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 1007 Salem Ln, Austin, TX 78753. The most recent, filed March 31, 2025, covers: “Needs gas test for gas 90 feet gas line”.
Compiled from City of Austin records · updated Mar 31, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 31, 2025
- since Mar 31, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNeeds gas test for gas 90 feet gas line
- AppliedMar 26, 2025
- IssuedMar 31, 2025
- WorkMar '25 – Apr '25
- Final inspectionApr 2, 2025
Passed final inspection Apr 2, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectNeeds gas test for gas 90 feet gas line
Needs gas test for gas 90 feet gas line
City of Austin permitPlumbing PermitFinal- Record
- 2025-035937 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1007 Salem Ln
What is being built at 1007 Salem Ln?
The latest filing (City of Austin permit 2025-035937 PP, March 31, 2025) covers needs gas test for gas 90 feet gas line.
How many permits and filings does 1007 Salem Ln have?
1 filing across 1 project, from March 31, 2025 to March 31, 2025.
Is there other construction near 1007 Salem Ln?
Yes. Nearby filings include 1009 Salem Ln (replacement of complete existing central heat and air system with or without duct work, Feb 14, 2025); 1006 Newport Ave (we will be removing the existing breaker box and meter socket (100a) and installing a 320a meter base and two 200a disconnects to provide power to the residential home, Sep 8, 2025); 1006 Salem Ln ((marandiz marco)- installation of circuit for elec. vehicle charging station-esip, Jan 11, 2024).
How do I get alerts for new permits at 1007 Salem Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1009 Salem LnFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 31 m away
- 1006 Newport AveSep 8, 2025We will be removing the existing breaker box and meter socket (100a) and installing a 320a meter base and two 200a disconnects to provide power to the residential home · 43 m away
- 1006 Salem LnJan 11, 2024(marandiz marco)- installation of circuit for elec. vehicle charging station-esip · 46 m away
- 1004 Salem LnJan 2, 2025Express: replace 2 existing windows · 57 m away
- 1007 Newport AveOct 7, 2026Replacement of an existing water heater 40g gas water heater replacement · 91 m away
- 1007 E Applegate DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 99 m away
- 1003 Newport AveNov 20, 2025110 tunnel below the foundation and 45 trench to replace and reroute drain system below the foundation. 3 access holes - front right left · 106 m away
- 1101 E Applegate DrNov 28, 2025Upgrading main service to 200 amps including meter socket and main panel · 116 m away
- 1003 E Applegate DrOct 15, 2025Replacement of complete existing central heat and air system with or without duct work robert day - replacing like for like 3t vert gas system · 116 m away
- 1103 E Applegate DrDec 4, 2024Upgrade service to a 200amp service and change inside panel · 129 m away
- 908 Newport AveJul 7, 2026200amp oh service build · 142 m away
- 908 Salem LnFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 142 m away