1103 E Applegate Dr
Austin, TX 78753
1103 E Applegate Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1103 E Applegate Dr, Austin, TX 78753. The most recent, filed December 4, 2024, covers: “Upgrade service to a 200amp service and change inside panel”.
Compiled from City of Austin records · updated Dec 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Dec 4, 2024
- since Dec 4, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectUpgrade service to a 200amp service and change inside panel
Upgrade service to a 200amp service and change inside panel
City of Austin permitElectrical PermitFinal- Record
- 2024-155294 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1103 E Applegate Dr
What is being built at 1103 E Applegate Dr?
The latest filing (City of Austin permit 2024-155294 EP, December 4, 2024) covers upgrade service to a 200amp service and change inside panel.
How many permits and filings does 1103 E Applegate Dr have?
1 filing across 1 project, from December 4, 2024 to December 4, 2024.
Is there other construction near 1103 E Applegate Dr?
Yes. Nearby filings include 1101 E Applegate Dr (upgrading main service to 200 amps including meter socket and main panel, Nov 28, 2025); 1104 Newport Ave (we are removing the old panel meter can and weather head. we are replacing the same with new. no other changes, Nov 9, 2026); 1106 E Applegate Dr (replacement of complete existing central heat and air system with or without duct work, Nov 1, 2024).
How do I get alerts for new permits at 1103 E Applegate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1101 E Applegate DrNov 28, 2025Upgrading main service to 200 amps including meter socket and main panel · 69 m away
- 1104 Newport AveNov 9, 2026We are removing the old panel meter can and weather head. we are replacing the same with new. no other changes · 78 m away
- 1106 E Applegate DrNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 1009 Salem LnFeb 14, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 1006 Salem LnJan 11, 2024(marandiz marco)- installation of circuit for elec. vehicle charging station-esip · 126 m away
- 1105 Newport AveMay 29, 2024Emergency replacement of damaged meter socket & riser · 126 m away
- 1007 Salem LnMar 31, 2025Needs gas test for gas 90 feet gas line · 129 m away
- 1107 Newport AveSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 132 m away
- 10501 Walnut Bend DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 142 m away
- 1006 Newport AveSep 8, 2025We will be removing the existing breaker box and meter socket (100a) and installing a 320a meter base and two 200a disconnects to provide power to the residential home · 145 m away
- 1007 E Applegate DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 145 m away
- 1109 Newport AveNov 12, 2025Tunnel from bathroom to bathroom 100 feet. open a hole behind master bathroom and another one behind guest bathroom to tunnel in. tunnel will go across under the house and connect to the kitchen sink on the way. make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. tear out all old cast iron and carry off. replace with schedule 40 pvc. it will run out from under the master bathroom and tie onto the main line. put in a new cleanout for the main and a new line running over to the main line in the yard. put in a new backwater valve in 4 pipe. run a new line for the washer/dryer and possibly a new vent and washer box. in bathrooms: install new p-traps and toilet flanges and reset all toilets. note: all 2 and 3 pvc will be hung at 4 foot intervals with stainless steel hangers · 150 m away