1106 E Applegate Dr
Austin, TX 78753
1106 E Applegate Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1106 E Applegate Dr, Austin, TX 78753. The most recent, filed November 1, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Nov 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Nov 1, 2024
- since Nov 1, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-142480 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1106 E Applegate Dr
What is being built at 1106 E Applegate Dr?
The latest filing (City of Austin permit 2024-142480 MP, November 1, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1106 E Applegate Dr have?
1 filing across 1 project, from November 1, 2024 to November 1, 2024.
Is there other construction near 1106 E Applegate Dr?
Yes. Nearby filings include 1202 E Applegate Dr (replacement of an existing water heater replace navien 210a2 gas tankless water heater location: exterior wall mount backyard, May 22, 2026); 1103 E Applegate Dr (upgrade service to a 200amp service and change inside panel, Dec 4, 2024); 1200 Newport Ave (35 tunnel below the foundation to replace entire drain system. 1 access hole - back, May 1, 2026).
How do I get alerts for new permits at 1106 E Applegate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1202 E Applegate DrMay 22, 2026Replacement of an existing water heater replace navien 210a2 gas tankless water heater location: exterior wall mount backyard · 66 m away
- 1103 E Applegate DrDec 4, 2024Upgrade service to a 200amp service and change inside panel · 97 m away
- 1200 Newport AveMay 1, 202635 tunnel below the foundation to replace entire drain system. 1 access hole - back · 121 m away
- 1101 E Applegate DrNov 28, 2025Upgrading main service to 200 amps including meter socket and main panel · 129 m away
- 1104 Newport AveNov 9, 2026We are removing the old panel meter can and weather head. we are replacing the same with new. no other changes · 130 m away
- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 137 m away
- 1202 Newport AveJan 31, 2025Tunnel and replace the underfloor rusted out cast iron waste and vent piping for the bathrooms · 143 m away
- 1107 Hollybluff StFeb 22, 2024Sewer cutover · 144 m away
- 1113 Hollybluff StJul 1, 2024Cutover from septic to city sewer · 146 m away
- 10501 Walnut Bend DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 161 m away
- 1109 Newport AveNov 12, 2025Tunnel from bathroom to bathroom 100 feet. open a hole behind master bathroom and another one behind guest bathroom to tunnel in. tunnel will go across under the house and connect to the kitchen sink on the way. make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. tear out all old cast iron and carry off. replace with schedule 40 pvc. it will run out from under the master bathroom and tie onto the main line. put in a new cleanout for the main and a new line running over to the main line in the yard. put in a new backwater valve in 4 pipe. run a new line for the washer/dryer and possibly a new vent and washer box. in bathrooms: install new p-traps and toilet flanges and reset all toilets. note: all 2 and 3 pvc will be hung at 4 foot intervals with stainless steel hangers · 164 m away
- 1107 Newport AveSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 165 m away