1107 Hollybluff St
Austin, TX 78753
1107 Hollybluff St: 1 project on record
City of Austin lists 1 filing across 1 project at 1107 Hollybluff St, Austin, TX 78753. The most recent, filed February 22, 2024, covers: “Sewer cutover”.
Compiled from City of Austin records · updated Feb 22, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 22, 2024
- since Feb 22, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSewer cutover
- AppliedFeb 21, 2024
- IssuedFeb 22, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 8, 2024
Passed final inspection Mar 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectSewer cutover
Sewer cutover
City of Austin permitPlumbing PermitFinal- Record
- 2024-021739 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1107 Hollybluff St
What is being built at 1107 Hollybluff St?
The latest filing (City of Austin permit 2024-021739 PP, February 22, 2024) covers sewer cutover.
How many permits and filings does 1107 Hollybluff St have?
1 filing across 1 project, from February 22, 2024 to February 22, 2024.
Is there other construction near 1107 Hollybluff St?
Yes. Nearby filings include 1109 Hollybluff St (replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition, Feb 25, 2026); 1103 Hollybluff St (cutover from septic to city sewer only ref 2026-129755 ww, Oct 8, 2026); 1113 Hollybluff St (cutover from septic to city sewer, Jul 1, 2024).
How do I get alerts for new permits at 1107 Hollybluff St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 30 m away
- 1103 Hollybluff StOct 8, 2026Cutover from septic to city sewer only ref 2026-129755 ww · 52 m away
- 1113 Hollybluff StJul 1, 2024Cutover from septic to city sewer · 59 m away
- 1101 Hollybluff StOct 29, 2024Repipe the clothes washer drain line thru the garage outside the right side of the house toward the front of the house. there we will run across the yard and connect to the existing sanitary sewer yard line. we will demolition and patch concrete in the garage as needed to run this new line. we will also cut out the kitchen cabinet bottom and back chip concrete enough to stub out a new waste line for the kitchen sink. we will repair the cabinet after inspections. we include the required engineer inspection and report · 78 m away
- 1110 Hollybluff StJul 31, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 78 m away
- 10501 Walnut Bend DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 10607 Denell CirMay 6, 2026Excavate 60 tunnel to repair main drain line under house · 102 m away
- 10601 Denell CirDec 3, 2024New pool prefabricated with concrete decking - no plumbing permit required · 122 m away
- 10611 Denell CirMay 8, 2025Gas line repair · 124 m away
- 1114 Hollybluff StApr 16, 2025Cutover from septic to city sewer only · 128 m away
- 1010 E Applegate DrSep 16, 2026Adding energy storage system to existing pv system · 130 m away
- 1101 E Applegate DrNov 28, 2025Upgrading main service to 200 amps including meter socket and main panel · 143 m away