1114 Hollybluff St
Austin, TX 78753
1114 Hollybluff St: 1 project on record
City of Austin lists 1 filing across 1 project at 1114 Hollybluff St, Austin, TX 78753. The most recent, filed April 16, 2025, covers: “Cutover from septic to city sewer only”.
Compiled from City of Austin records · updated Apr 16, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 16, 2025
- since Apr 16, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCutover from septic to city sewer only
- AppliedApr 14, 2025
- IssuedApr 16, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 17, 2025
Passed final inspection Apr 17, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectCutover from septic to city sewer only
Cutover from septic to city sewer only
City of Austin permitPlumbing PermitFinal- Record
- 2025-045250 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1114 Hollybluff St
What is being built at 1114 Hollybluff St?
The latest filing (City of Austin permit 2025-045250 PP, April 16, 2025) covers cutover from septic to city sewer only.
How many permits and filings does 1114 Hollybluff St have?
1 filing across 1 project, from April 16, 2025 to April 16, 2025.
Is there other construction near 1114 Hollybluff St?
Yes. Nearby filings include 10613 Denell Cir (perkin electrical services will remove and replace the existing electrical service equipment and upgrade the system to a new 200-amp electrical service, Oct 23, 2026); 10611 Denell Cir (gas line repair, May 8, 2025); 1110 Hollybluff St (meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel, Jul 31, 2026).
How do I get alerts for new permits at 1114 Hollybluff St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 10613 Denell CirOct 23, 2026Perkin electrical services will remove and replace the existing electrical service equipment and upgrade the system to a new 200-amp electrical service · 35 m away
- 10611 Denell CirMay 8, 2025Gas line repair · 43 m away
- 1110 Hollybluff StJul 31, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 56 m away
- 10615 Denell CirMay 7, 2025Replacing exterior zinsco electrical panel with a new 200a service panel and meter socket · 77 m away
- 10607 Denell CirMay 6, 2026Excavate 60 tunnel to repair main drain line under house · 81 m away
- 1113 Hollybluff StJul 1, 2024Cutover from septic to city sewer · 81 m away
- 10617 Denell CirNov 4, 2025We are seeking a permit to replace the panel weatherhead and meter can · 103 m away
- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 106 m away
- 1107 Hollybluff StFeb 22, 2024Sewer cutover · 128 m away
- 1202 Somerset AveMay 20, 2024Cutover from septic to city sewer only · 134 m away
- 10708 Claywood DrOct 16, 2026Base: installing a backup battery system and additional meter socket · 148 m away
- 10621 Denell CirApr 2, 2024Express wheelchair ramp · 152 m away