1113 Hollybluff St
Austin, TX 78753
1113 Hollybluff St: 1 project on record
City of Austin lists 1 filing across 1 project at 1113 Hollybluff St, Austin, TX 78753. The most recent, filed July 1, 2024, covers: “Cutover from septic to city sewer”.
Compiled from City of Austin records · updated Jul 1, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 1, 2024
- since Jul 1, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCutover from septic to city sewer
- AppliedJun 28, 2024
- IssuedJul 1, 2024
- WorkJul '24 – Jul '24
- Final inspectionJul 8, 2024
Passed final inspection Jul 8, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectCutover from septic to city sewer
Cutover from septic to city sewer
City of Austin permitPlumbing PermitFinal- Record
- 2024-081465 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1113 Hollybluff St
What is being built at 1113 Hollybluff St?
The latest filing (City of Austin permit 2024-081465 PP, July 1, 2024) covers cutover from septic to city sewer.
How many permits and filings does 1113 Hollybluff St have?
1 filing across 1 project, from July 1, 2024 to July 1, 2024.
Is there other construction near 1113 Hollybluff St?
Yes. Nearby filings include 1109 Hollybluff St (replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition, Feb 25, 2026); 1110 Hollybluff St (meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel, Jul 31, 2026); 1107 Hollybluff St (sewer cutover, Feb 22, 2024).
How do I get alerts for new permits at 1113 Hollybluff St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 29 m away
- 1110 Hollybluff StJul 31, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 53 m away
- 1107 Hollybluff StFeb 22, 2024Sewer cutover · 59 m away
- 1114 Hollybluff StApr 16, 2025Cutover from septic to city sewer only · 81 m away
- 10611 Denell CirMay 8, 2025Gas line repair · 95 m away
- 10607 Denell CirMay 6, 2026Excavate 60 tunnel to repair main drain line under house · 97 m away
- 1103 Hollybluff StOct 8, 2026Cutover from septic to city sewer only ref 2026-129755 ww · 110 m away
- 10613 Denell CirOct 23, 2026Perkin electrical services will remove and replace the existing electrical service equipment and upgrade the system to a new 200-amp electrical service · 112 m away
- 1101 Hollybluff StOct 29, 2024Repipe the clothes washer drain line thru the garage outside the right side of the house toward the front of the house. there we will run across the yard and connect to the existing sanitary sewer yard line. we will demolition and patch concrete in the garage as needed to run this new line. we will also cut out the kitchen cabinet bottom and back chip concrete enough to stub out a new waste line for the kitchen sink. we will repair the cabinet after inspections. we include the required engineer inspection and report · 136 m away
- 1202 Somerset AveMay 20, 2024Cutover from septic to city sewer only · 141 m away
- 1202 E Applegate DrMay 22, 2026Replacement of an existing water heater replace navien 210a2 gas tankless water heater location: exterior wall mount backyard · 145 m away
- 1106 E Applegate DrNov 1, 2024Replacement of complete existing central heat and air system with or without duct work · 146 m away