1103 Hollybluff St
Austin, TX 78753
Septic-to-city-sewer work at 1103 Hollybluff St
A plumbing permit indicates a cutover from septic to city sewer at 1103 Hollybluff St. The City of Austin permit, 2026-129749 PP, was filed October 8, 2026, and is listed as final.
Summarized from City of Austin records · updated Oct 8, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 8, 2026
- since Oct 8, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCutover from septic to city sewer only ref 2026-129755 ww
- AppliedOct 2, 2026
- IssuedOct 8, 2026
- WorkOct '26 – Nov '26
- Final inspectionNov 4, 2026
Passed final inspection Nov 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectCutover from septic to city sewer only ref 2026-129755 ww
Cutover from septic to city sewer only ref 2026-129755 ww
City of Austin permitPlumbing PermitFinal- Record
- 2026-129749 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1103 Hollybluff St
What is happening at 1103 Hollybluff St?
A City of Austin plumbing permit indicates a cutover from septic to city sewer. The permit was filed October 8, 2026.
Is a new home being built at 1103 Hollybluff St?
The available permit describes septic-to-city-sewer work, not new home construction.
When was the sewer work at 1103 Hollybluff St permitted?
The City of Austin filed plumbing permit 2026-129749 PP on October 8, 2026.
What kind of permit was filed for 1103 Hollybluff St?
It is a City of Austin plumbing permit for a cutover from septic to city sewer.
Is the permit for 1103 Hollybluff St final?
Yes. City of Austin records list permit 2026-129749 PP as final.
Also being built nearby
All of 78753- 1101 Hollybluff StOct 29, 2024Repipe the clothes washer drain line thru the garage outside the right side of the house toward the front of the house. there we will run across the yard and connect to the existing sanitary sewer yard line. we will demolition and patch concrete in the garage as needed to run this new line. we will also cut out the kitchen cabinet bottom and back chip concrete enough to stub out a new waste line for the kitchen sink. we will repair the cabinet after inspections. we include the required engineer inspection and report · 26 m away
- 10501 Walnut Bend DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 49 m away
- 1107 Hollybluff StFeb 22, 2024Sewer cutover · 52 m away
- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 81 m away
- 1010 E Applegate DrSep 16, 2026Adding energy storage system to existing pv system · 84 m away
- 10601 Denell CirDec 3, 2024New pool prefabricated with concrete decking - no plumbing permit required · 98 m away
- 1113 Hollybluff StJul 1, 2024Cutover from septic to city sewer · 110 m away
- 1006 Hollybluff StSep 3, 2026Excavate 40 tunnel to repair main drain line under house · 109 m away
- 1006 E Applegate DrAug 7, 2026Tpole · 116 m away
- 1110 Hollybluff StJul 31, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 116 m away
- 1101 E Applegate DrNov 28, 2025Upgrading main service to 200 amps including meter socket and main panel · 123 m away
- 10607 Denell CirMay 6, 2026Excavate 60 tunnel to repair main drain line under house · 123 m away