Drain-line and electrical repairs at 1006 Hollybluff St
City of Austin permits indicate work on the existing home, including a tunnel to repair the main drain line and replacement of an electrical riser with a surge protector. The electrical permit was filed June 5, 2026, and the plumbing permit was filed September 3, 2026; both are marked final.
Summarized from City of Austin records · updated Sep 3, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 3, 2026
- since Jun 5, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 40 tunnel to repair main drain line under house
- AppliedAug 31, 2026
- IssuedSep 3, 2026
- WorkSep '26 – Sep '26
- Final inspectionSep 23, 2026
Passed final inspection Sep 23, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsExcavate 40 tunnel to repair main drain line under house
Excavate 40 tunnel to repair main drain line under house
City of Austin permitPlumbing PermitFinal- Record
- 2026-113738 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Riser replacement and adding surge protector
Riser replacement and adding surge protector
City of Austin permitElectrical PermitFinal- Record
- 2026-070310 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1006 Hollybluff St
What is being built at 1006 Hollybluff St in Austin?
The permits indicate repairs and electrical work at the existing home, not a new building. The work includes repairing the main drain line and replacing an electrical riser with a surge protector.
Is a new house being built at 1006 Hollybluff St?
The City of Austin records provided list plumbing and electrical permits for the address, not a new-home construction permit.
What plumbing work is permitted at 1006 Hollybluff St?
Permit 2026-113738 PP, filed September 3, 2026, describes excavating a tunnel to repair the main drain line under the house. Its status is final.
What electrical work is happening at 1006 Hollybluff St?
Permit 2026-070310 EP describes replacing a riser and adding a surge protector. It was filed June 5, 2026, and is marked final.
When were the permits filed for 1006 Hollybluff St?
The electrical permit was filed June 5, 2026, and the plumbing permit was filed September 3, 2026. Both are marked final.
Also being built nearby
All of 78753- 1005 Hollybluff StMar 5, 2024Cutover from septic to city sewer only 2024-023243 ww · 49 m away
- 10512 Walnut Bend DrJun 8, 2026Tunneling up to 85 feet of building waste drain line to replace existing cast iron with pvc · 74 m away
- 1101 Hollybluff StOct 29, 2024Repipe the clothes washer drain line thru the garage outside the right side of the house toward the front of the house. there we will run across the yard and connect to the existing sanitary sewer yard line. we will demolition and patch concrete in the garage as needed to run this new line. we will also cut out the kitchen cabinet bottom and back chip concrete enough to stub out a new waste line for the kitchen sink. we will repair the cabinet after inspections. we include the required engineer inspection and report · 87 m away
- 10601 Denell CirDec 3, 2024New pool prefabricated with concrete decking - no plumbing permit required · 89 m away
- 1006 E Applegate DrAug 7, 2026Tpole · 91 m away
- 1010 E Applegate DrSep 16, 2026Adding energy storage system to existing pv system · 96 m away
- 1001 Hollybluff StFeb 28, 2024Replacement of an existing water heater · 101 m away
- 1103 Hollybluff StOct 8, 2026Cutover from septic to city sewer only ref 2026-129755 ww · 109 m away
- 10501 Walnut Bend DrMay 29, 2024Replacement of complete existing central heat and air system with or without duct work · 111 m away
- 10601 Bluff Bend DrJul 16, 2026Holy word church · 136 m away
- 908 Hollybluff StDec 30, 2025Customer had a four tags 1 four water heater gas line leaking removed any rusted fittings and replaced it with new black iron fittings. fireplace was leaking as well that was tagged there was a copper line feeding fireplace trace that back into the furnace closet using a half inch nipple and a half inch cap. i capped off tee that was feeding copper gas line. put the whole house on test at meter using a 1 inch bell reducer to three-quarter put the pressure at 15 psi it held for 20 minutes pulling inspection for job as well to ensure there are no leaks on the system · 137 m away
- 1007 E Applegate DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 145 m away