1001 Hollybluff St
Austin, TX 78753
1001 Hollybluff St: 1 project on record
City of Austin lists 1 filing across 1 project at 1001 Hollybluff St, Austin, TX 78753. The most recent, filed February 28, 2024, covers: “Replacement of an existing water heater”.
Compiled from City of Austin records · updated Feb 28, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 28, 2024
- since Feb 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of an existing water heater
- AppliedFeb 27, 2024
- IssuedFeb 28, 2024
- !WorkFeb '24 – Sep '24
- Final inspection
Marked expired Sep 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitExpired- Record
- 2024-024199 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1001 Hollybluff St
What is being built at 1001 Hollybluff St?
The latest filing (City of Austin permit 2024-024199 PP, February 28, 2024) covers replacement of an existing water heater.
How many permits and filings does 1001 Hollybluff St have?
1 filing across 1 project, from February 28, 2024 to February 28, 2024.
Is there other construction near 1001 Hollybluff St?
Yes. Nearby filings include 1005 Hollybluff St (cutover from septic to city sewer only 2024-023243 ww, Mar 5, 2024); 908 Hollybluff St (customer had a four tags 1 four water heater gas line leaking removed any rusted fittings and replaced it with new black iron fittings. fireplace was leaking as well that was tagged there was a copper line feeding fireplace trace that back into the furnace closet using a half inch nipple and a half inch cap. i capped off tee that was feeding copper gas line. put the whole house on test at meter using a 1 inch bell reducer to three-quarter put the pressure at 15 psi it held for 20 minutes pulling inspection for job as well to ensure there are no leaks on the system, Dec 30, 2025); 906 E Applegate Dr (replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total, Mar 31, 2026).
How do I get alerts for new permits at 1001 Hollybluff St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1005 Hollybluff StMar 5, 2024Cutover from septic to city sewer only 2024-023243 ww · 62 m away
- 908 Hollybluff StDec 30, 2025Customer had a four tags 1 four water heater gas line leaking removed any rusted fittings and replaced it with new black iron fittings. fireplace was leaking as well that was tagged there was a copper line feeding fireplace trace that back into the furnace closet using a half inch nipple and a half inch cap. i capped off tee that was feeding copper gas line. put the whole house on test at meter using a 1 inch bell reducer to three-quarter put the pressure at 15 psi it held for 20 minutes pulling inspection for job as well to ensure there are no leaks on the system · 63 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 92 m away
- 1006 Hollybluff StSep 3, 2026Excavate 40 tunnel to repair main drain line under house · 101 m away
- 1006 E Applegate DrAug 7, 2026Tpole · 102 m away
- 1003 E Applegate DrOct 15, 2025Replacement of complete existing central heat and air system with or without duct work robert day - replacing like for like 3t vert gas system · 109 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 110 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 115 m away
- 909 E Applegate DrMay 14, 2025Replace sewer line under homes foundation. approximately 80 feet · 115 m away
- 1010 E Applegate DrSep 16, 2026Adding energy storage system to existing pv system · 135 m away
- 903 Hollybluff StNov 19, 2024We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code · 137 m away
- 1007 E Applegate DrAug 18, 2026Replacement of complete existing central heat and air system with or without duct work · 138 m away