909 E Applegate Dr
Austin, TX 78753
909 E Applegate Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 909 E Applegate Dr, Austin, TX 78753. The most recent, filed May 14, 2025, covers: “Replace sewer line under homes foundation. approximately 80 feet”.
Compiled from City of Austin records · updated May 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 14, 2025
- since May 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace sewer line under homes foundation. approximately 80 feet
Replace sewer line under homes foundation. approximately 80 feet
City of Austin permitPlumbing PermitFinal- Record
- 2025-059141 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 909 E Applegate Dr
What is being built at 909 E Applegate Dr?
The latest filing (City of Austin permit 2025-059141 PP, May 14, 2025) covers replace sewer line under homes foundation. approximately 80 feet.
How many permits and filings does 909 E Applegate Dr have?
1 filing across 1 project, from May 14, 2025 to May 14, 2025.
Is there other construction near 909 E Applegate Dr?
Yes. Nearby filings include 908 Salem Ln (replacement of complete existing central heat and air system with or without duct work, Feb 24, 2026); 906 Salem Ln (electrical service replacement. customer currently has ae and is upgrading meter, Nov 16, 2023); 905 E Applegate Dr (replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit, Jul 7, 2024).
How do I get alerts for new permits at 909 E Applegate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 908 Salem LnFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 906 Salem LnNov 16, 2023Electrical service replacement. customer currently has ae and is upgrading meter · 58 m away
- 905 E Applegate DrJul 7, 2024Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit · 60 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 70 m away
- 1003 E Applegate DrOct 15, 2025Replacement of complete existing central heat and air system with or without duct work robert day - replacing like for like 3t vert gas system · 75 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 84 m away
- 907 Salem LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas · 97 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 105 m away
- 1001 Hollybluff StFeb 28, 2024Replacement of an existing water heater · 115 m away
- 1004 Salem LnJan 2, 2025Express: replace 2 existing windows · 116 m away
- 901 E Applegate DrMar 21, 2024Express: replace 12 existing windows · 124 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 125 m away