groundranger
Historic · latest filing May 2025Residential

909 E Applegate Dr

Austin, TX 78753

909 E Applegate Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 909 E Applegate Dr, Austin, TX 78753. The most recent, filed May 14, 2025, covers: “Replace sewer line under homes foundation. approximately 80 feet”.

Compiled from City of Austin records · updated May 14, 2025

Projects
1
1 filings
Latest filing
May 14, 2025
since May 14, 2025
Largest scope
—
Listed value
—

Permit & project history

1 project
  1. Replace sewer line under homes foundation. approximately 80 feet

    Replace sewer line under homes foundation. approximately 80 feet

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 909 E Applegate Dr

What is being built at 909 E Applegate Dr?

The latest filing (City of Austin permit 2025-059141 PP, May 14, 2025) covers replace sewer line under homes foundation. approximately 80 feet.

How many permits and filings does 909 E Applegate Dr have?

1 filing across 1 project, from May 14, 2025 to May 14, 2025.

Is there other construction near 909 E Applegate Dr?

Yes. Nearby filings include 908 Salem Ln (replacement of complete existing central heat and air system with or without duct work, Feb 24, 2026); 906 Salem Ln (electrical service replacement. customer currently has ae and is upgrading meter, Nov 16, 2023); 905 E Applegate Dr (replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit, Jul 7, 2024).

How do I get alerts for new permits at 909 E Applegate Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Get alerts for 909 E Applegate Dr