905 Hollybluff St

Austin, TX 78753

905 Hollybluff St: 2 projects on record

City of Austin lists 2 filings across 2 projects at 905 Hollybluff St, Austin, TX 78753 since July 31, 2024. The most recent, filed September 9, 2024, covers: “65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line”.

Compiled from City of Austin records · updated Sep 9, 2024

Projects
2
2 filings
Latest filing
Sep 9, 2024
since Jul 31, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line

  1. AppliedSep 4, 2024
  2. IssuedSep 9, 2024
  3. WorkSep '24 – Oct '24
  4. Final inspectionOct 15, 2024

Passed final inspection Oct 15, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line

    65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Service rebuild

    Service rebuild

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 905 Hollybluff St

What is being built at 905 Hollybluff St?

The latest filing (City of Austin permit 2024-112688 PP, September 9, 2024) covers 65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line.

How many permits and filings does 905 Hollybluff St have?

2 filings across 2 projects, from July 31, 2024 to September 9, 2024.

Is there other construction near 905 Hollybluff St?

Yes. Nearby filings include 903 Hollybluff St (we will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code, Nov 19, 2024); 904 E Applegate Dr (the 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation, May 7, 2026); 906 E Applegate Dr (replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total, Mar 31, 2026).

How do I get alerts for new permits at 905 Hollybluff St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.