groundranger
Historic · latest filing Nov 2024Residential

903 Hollybluff St

Austin, TX 78753

903 Hollybluff St: 1 project on record

City of Austin lists 1 filing across 1 project at 903 Hollybluff St, Austin, TX 78753. The most recent, filed November 19, 2024, covers: “We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code”.

Compiled from City of Austin records · updated Nov 19, 2024

Projects
1
1 filings
Latest filing
Nov 19, 2024
since Nov 19, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code

  1. AppliedOct 29, 2024
  2. IssuedNov 19, 2024
  3. WorkNov '24 – Jan '25
  4. Final inspectionJan 10, 2025

Passed final inspection Jan 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code

    We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 903 Hollybluff St

What is being built at 903 Hollybluff St?

The latest filing (City of Austin permit 2024-144774 EP, November 19, 2024) covers we will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code.

How many permits and filings does 903 Hollybluff St have?

1 filing across 1 project, from November 19, 2024 to November 19, 2024.

Is there other construction near 903 Hollybluff St?

Yes. Nearby filings include 905 Hollybluff St (65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line, Sep 9, 2024); 900 Hollybluff St (basilio - upgrade existing meter and braided wire, Apr 29, 2024); 904 E Applegate Dr (the 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation, May 7, 2026).

How do I get alerts for new permits at 903 Hollybluff St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed