905 E Applegate Dr
Austin, TX 78753
905 E Applegate Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 905 E Applegate Dr, Austin, TX 78753. The most recent, filed July 7, 2024, covers: “Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit”.
Compiled from City of Austin records · updated Jul 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jul 7, 2024
- since Jul 7, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectReplace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit
Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit
City of Austin permitPlumbing PermitFinal- Record
- 2024-082514 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 905 E Applegate Dr
What is being built at 905 E Applegate Dr?
The latest filing (City of Austin permit 2024-082514 PP, July 7, 2024) covers replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit.
How many permits and filings does 905 E Applegate Dr have?
1 filing across 1 project, from July 7, 2024 to July 7, 2024.
Is there other construction near 905 E Applegate Dr?
Yes. Nearby filings include 906 Salem Ln (electrical service replacement. customer currently has ae and is upgrading meter, Nov 16, 2023); 904 E Applegate Dr (the 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation, May 7, 2026); 909 E Applegate Dr (replace sewer line under homes foundation. approximately 80 feet, May 14, 2025).
How do I get alerts for new permits at 905 E Applegate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 906 Salem LnNov 16, 2023Electrical service replacement. customer currently has ae and is upgrading meter · 55 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 57 m away
- 909 E Applegate DrMay 14, 2025Replace sewer line under homes foundation. approximately 80 feet · 60 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 60 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 64 m away
- 901 E Applegate DrMar 21, 2024Express: replace 12 existing windows · 65 m away
- 908 Salem LnFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 77 m away
- 900 E Applegate DrJun 29, 202640 trench from homeowner cleanout to city tap to replace main building sewer line · 89 m away
- 907 Salem LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas · 99 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 102 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 105 m away
- 903 Hollybluff StNov 19, 2024We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code · 112 m away