906 Salem Ln
Austin, TX 78753
906 Salem Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 906 Salem Ln, Austin, TX 78753. The most recent, filed November 16, 2023, covers: “Electrical service replacement. customer currently has ae and is upgrading meter”.
Compiled from City of Austin records · updated Nov 16, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Nov 16, 2023
- since Nov 16, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledElectrical service replacement. customer currently has ae and is upgrading meter
- AppliedNov 16, 2023
- IssuedNov 16, 2023
- WorkNov '23 – May '24
- Final inspectionMay 24, 2024
Passed final inspection May 24, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectElectrical service replacement. customer currently has ae and is upgrading meter
Electrical service replacement. customer currently has ae and is upgrading meter
City of Austin permitElectrical PermitFinal- Record
- 2023-148698 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 906 Salem Ln
What is being built at 906 Salem Ln?
The latest filing (City of Austin permit 2023-148698 EP, November 16, 2023) covers electrical service replacement. customer currently has ae and is upgrading meter.
How many permits and filings does 906 Salem Ln have?
1 filing across 1 project, from November 16, 2023 to November 16, 2023.
Is there other construction near 906 Salem Ln?
Yes. Nearby filings include 908 Salem Ln (replacement of complete existing central heat and air system with or without duct work, Feb 24, 2026); 907 Salem Ln (replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas, Dec 6, 2024); 905 E Applegate Dr (replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit, Jul 7, 2024).
How do I get alerts for new permits at 906 Salem Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 908 Salem LnFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 33 m away
- 907 Salem LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas · 46 m away
- 905 E Applegate DrJul 7, 2024Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit · 55 m away
- 909 E Applegate DrMay 14, 2025Replace sewer line under homes foundation. approximately 80 feet · 58 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 60 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 76 m away
- 906 Newport AveAug 6, 2024Schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule · 97 m away
- 904 Newport AveJan 30, 2024Replacing existing overhead meter-loop with new meter-loop and service disconnect · 99 m away
- 908 Newport AveJul 7, 2026200amp oh service build · 102 m away
- 901 E Applegate DrMar 21, 2024Express: replace 12 existing windows · 103 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 108 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 109 m away