groundranger
Historic · latest filing Dec 2024Residential

907 Salem Ln

Austin, TX 78753

907 Salem Ln: 1 project on record

City of Austin lists 1 filing across 1 project at 907 Salem Ln, Austin, TX 78753. The most recent, filed December 6, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas”.

Compiled from City of Austin records · updated Dec 6, 2024

Projects
1
1 filings
Latest filing
Dec 6, 2024
since Dec 6, 2024
Largest scope
—
Listed value
—

Where this project stands

Permit expired

Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas

  1. AppliedNov 26, 2024
  2. IssuedDec 6, 2024
  3. !WorkDec '24 – Jun '25
  4. Final inspection

Marked expired Jun 5, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas

    Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas

    City of Austin permitMechanical PermitExpired
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 907 Salem Ln

What is being built at 907 Salem Ln?

The latest filing (City of Austin permit 2024-156479 MP, December 6, 2024) covers replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas.

How many permits and filings does 907 Salem Ln have?

1 filing across 1 project, from December 6, 2024 to December 6, 2024.

Is there other construction near 907 Salem Ln?

Yes. Nearby filings include 906 Salem Ln (electrical service replacement. customer currently has ae and is upgrading meter, Nov 16, 2023); 906 Newport Ave (schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule, Aug 6, 2024); 908 Salem Ln (replacement of complete existing central heat and air system with or without duct work, Feb 24, 2026).

How do I get alerts for new permits at 907 Salem Ln?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed