905 Newport Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 905 Newport Ave, Austin, TX 78753. The most recent, filed September 5, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Sep 5, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 5, 2024
- since Sep 5, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedAug 26, 2024
- IssuedSep 5, 2024
- WorkSep '24 – Mar '25
- Final inspectionOct 25, 2024
Passed final inspection Oct 25, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-109115 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 905 Newport Ave
What is being built at 905 Newport Ave?
The latest filing (City of Austin permit 2024-109115 MP, September 5, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 905 Newport Ave have?
1 filing across 1 project, from September 5, 2024 to September 5, 2024.
Is there other construction near 905 Newport Ave?
Yes. Nearby filings include 904 Newport Ave (replacing existing overhead meter-loop with new meter-loop and service disconnect, Jan 30, 2024); 906 Newport Ave (schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule, Aug 6, 2024); 908 Newport Ave (200amp oh service build, Jul 7, 2026).
How do I get alerts for new permits at 905 Newport Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 904 Newport AveJan 30, 2024Replacing existing overhead meter-loop with new meter-loop and service disconnect · 44 m away
- 906 Newport AveAug 6, 2024Schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule · 53 m away
- 908 Newport AveJul 7, 2026200amp oh service build · 75 m away
- 811 Newport AveJul 23, 2026Tunnel approximately 30 feet and replace all the underfloor cast iron waste piping with pvc. we will also run the kitchen sink and washer drain thru the wall to the outside. there we will run across the back yard and connect to the rear bathroom waste line. if necessary for proper slope we will run to the city cleanout at the easement · 93 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 96 m away
- 907 Salem LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas · 100 m away
- 810 Newport AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 102 m away
- 808 Newport AveJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 808 Floradale DrJan 15, 2025Amnesty co · 133 m away
- 1003 Newport AveNov 20, 2025110 tunnel below the foundation and 45 trench to replace and reroute drain system below the foundation. 3 access holes - front right left · 138 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 142 m away
- 906 Salem LnNov 16, 2023Electrical service replacement. customer currently has ae and is upgrading meter · 143 m away