City of Austin lists 1 filing across 1 project at 906 Newport Ave, Austin, TX 78753. The most recent, filed August 6, 2024, covers: “Schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule”.
Compiled from City of Austin records · updated Aug 6, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 6, 2024
- since Aug 6, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledSchedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule
- AppliedJul 31, 2024
- IssuedAug 6, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 21, 2024
Passed final inspection Aug 21, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectSchedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule
Schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule
City of Austin permitElectrical PermitFinal- Record
- 2024-096455 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 906 Newport Ave
What is being built at 906 Newport Ave?
The latest filing (City of Austin permit 2024-096455 EP, August 6, 2024) covers schedule a controlled shutdown with austin energy. remove existing electrical service equipment. install a 150 amp through the roof service riser and meter per ae specifications. install a 150 amp main breaker service panel and branch circuit breakers. install a new grounding system as required. install a surge protection device and inter system bonding block as required. terminate existing loads to new circuit breakers and verify an accurate panel schedule.
How many permits and filings does 906 Newport Ave have?
1 filing across 1 project, from August 6, 2024 to August 6, 2024.
Is there other construction near 906 Newport Ave?
Yes. Nearby filings include 904 Newport Ave (replacing existing overhead meter-loop with new meter-loop and service disconnect, Jan 30, 2024); 908 Newport Ave (200amp oh service build, Jul 7, 2026); 907 Salem Ln (replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas, Dec 6, 2024).
How do I get alerts for new permits at 906 Newport Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 904 Newport AveJan 30, 2024Replacing existing overhead meter-loop with new meter-loop and service disconnect · 28 m away
- 908 Newport AveJul 7, 2026200amp oh service build · 30 m away
- 907 Salem LnDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton vertical gas · 51 m away
- 905 Newport AveSep 5, 2024Replacement of complete existing central heat and air system with or without duct work · 53 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 78 m away
- 906 Salem LnNov 16, 2023Electrical service replacement. customer currently has ae and is upgrading meter · 97 m away
- 908 Salem LnFeb 24, 2026Replacement of complete existing central heat and air system with or without duct work · 101 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 113 m away
- 1003 Newport AveNov 20, 2025110 tunnel below the foundation and 45 trench to replace and reroute drain system below the foundation. 3 access holes - front right left · 116 m away
- 810 Newport AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 124 m away
- 811 Newport AveJul 23, 2026Tunnel approximately 30 feet and replace all the underfloor cast iron waste piping with pvc. we will also run the kitchen sink and washer drain thru the wall to the outside. there we will run across the back yard and connect to the rear bathroom waste line. if necessary for proper slope we will run to the city cleanout at the easement · 132 m away
- 1002 Floradale DrOct 15, 2026Express: remove and replace 3 windows (like for like) · 142 m away