901 E Applegate Dr
Austin, TX 78753
901 E Applegate Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 901 E Applegate Dr, Austin, TX 78753. The most recent, filed March 21, 2024, covers: “Express: replace 12 existing windows”.
Compiled from City of Austin records · updated Mar 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 21, 2024
- since Mar 21, 2024
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectExpress: replace 12 existing windows
Express: replace 12 existing windows
City of Austin permitBuilding PermitFinal- Record
- 2024-035278 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 901 E Applegate Dr
What is being built at 901 E Applegate Dr?
The latest filing (City of Austin permit 2024-035278 BP, March 21, 2024) covers express: replace 12 existing windows.
How many permits and filings does 901 E Applegate Dr have?
1 filing across 1 project, from March 21, 2024 to March 21, 2024.
Is there other construction near 901 E Applegate Dr?
Yes. Nearby filings include 900 E Applegate Dr (40 trench from homeowner cleanout to city tap to replace main building sewer line, Jun 29, 2026); 902 Salem Ln (replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80%, Jul 9, 2026); 905 E Applegate Dr (replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit, Jul 7, 2024).
How do I get alerts for new permits at 901 E Applegate Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 900 E Applegate DrJun 29, 202640 trench from homeowner cleanout to city tap to replace main building sewer line · 55 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 59 m away
- 905 E Applegate DrJul 7, 2024Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit · 65 m away
- 808 Salem LnMar 11, 2024Abandon septic tank and connect to city sewer tap ref: 2024-027868 w · 79 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 85 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 102 m away
- 906 Salem LnNov 16, 2023Electrical service replacement. customer currently has ae and is upgrading meter · 103 m away
- 806 E Applegate DrJul 16, 2024Replace damaged panel from storm house without power for 6 weeks with tenant inside emergency approval needed · 105 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 106 m away
- 903 Hollybluff StNov 19, 2024We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code · 110 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 120 m away
- 909 E Applegate DrMay 14, 2025Replace sewer line under homes foundation. approximately 80 feet · 124 m away