groundranger
Recent · latest filing Mar 2026Residential

906 E Applegate Dr

Austin, TX 78753

906 E Applegate Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 906 E Applegate Dr, Austin, TX 78753. The most recent, filed March 31, 2026, covers: “Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total”.

Compiled from City of Austin records · updated Mar 31, 2026

Projects
2
2 filings
Latest filing
Mar 31, 2026
since Mar 31, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total

    Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Tunnel and replace the underfloor cast iron waste and vent for the 2 restrooms with pvc

    Tunnel and replace the underfloor cast iron waste and vent for the 2 restrooms with pvc

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 906 E Applegate Dr

What is being built at 906 E Applegate Dr?

The latest filing (City of Austin permit 2026-035762 PP, March 31, 2026) covers replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total.

How many permits and filings does 906 E Applegate Dr have?

2 filings across 2 projects, from March 31, 2026 to March 31, 2026.

Is there other construction near 906 E Applegate Dr?

Yes. Nearby filings include 904 E Applegate Dr (the 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation, May 7, 2026); 905 Hollybluff St (65ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line, Sep 9, 2024); 905 E Applegate Dr (replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit, Jul 7, 2024).

How do I get alerts for new permits at 906 E Applegate Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Get alerts for 906 E Applegate Dr