808 Salem Ln
Austin, TX 78753
808 Salem Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 808 Salem Ln, Austin, TX 78753. The most recent, filed March 11, 2024, covers: “Abandon septic tank and connect to city sewer tap ref: 2024-027868 w”.
Compiled from City of Austin records · updated Mar 11, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Mar 11, 2024
- since Mar 11, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledAbandon septic tank and connect to city sewer tap ref: 2024-027868 w
- AppliedMar 4, 2024
- IssuedMar 11, 2024
- WorkMar '24 – Mar '24
- Final inspectionMar 14, 2024
Passed final inspection Mar 14, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectAbandon septic tank and connect to city sewer tap ref: 2024-027868 w
Abandon septic tank and connect to city sewer tap ref: 2024-027868 w
City of Austin permitPlumbing PermitFinal- Record
- 2024-026782 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 808 Salem Ln
What is being built at 808 Salem Ln?
The latest filing (City of Austin permit 2024-026782 PP, March 11, 2024) covers abandon septic tank and connect to city sewer tap ref: 2024-027868 w.
How many permits and filings does 808 Salem Ln have?
1 filing across 1 project, from March 11, 2024 to March 11, 2024.
Is there other construction near 808 Salem Ln?
Yes. Nearby filings include 804 Salem Ln (express: replacing windows like for like, Aug 14, 2024); 901 E Applegate Dr (express: replace 12 existing windows, Mar 21, 2024); 902 Salem Ln (replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80%, Jul 9, 2026).
How do I get alerts for new permits at 808 Salem Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 804 Salem LnAug 14, 2024Express: replacing windows like for like · 64 m away
- 901 E Applegate DrMar 21, 2024Express: replace 12 existing windows · 79 m away
- 902 Salem LnJul 9, 2026Replacement of complete existing central heat and air system with or without duct work change out of lennox 3.0 ton merit (up-flow) gas 80% · 92 m away
- 808 Newport AveJun 19, 2025Replacement of complete existing central heat and air system with or without duct work · 97 m away
- 810 Newport AveOct 28, 2026Base: installing a backup battery system and additional meter socket · 100 m away
- 806 Newport AveJan 13, 2025New detached workshop building · 101 m away
- 903 Salem LnJan 14, 2026Tempopary disconnect/reconnect requested for solar and battery install · 104 m away
- 806 E Applegate DrJul 16, 2024Replace damaged panel from storm house without power for 6 weeks with tenant inside emergency approval needed · 107 m away
- 900 E Applegate DrJun 29, 202640 trench from homeowner cleanout to city tap to replace main building sewer line · 119 m away
- 804 E Applegate DrAug 4, 2026Reper broken sewer line for restroom and reconcted from outside · 122 m away
- 800 Salem LnSep 22, 2026Base: installing a backup battery system and additional meter socket · 125 m away
- 905 E Applegate DrJul 7, 2024Replace all existing underfloor sanitary waste and vent cast iron piping under the floor of this single family residence. this will be accomplished by tunneling under the foundation in the rear of the house to get to the rear bathroom tunneling under the foundation on the east side of the house to get to the second bathroom and running each line out to the existing pvc yard line that was installed 5 or 6 years ago. each tunnel will go in about 8 feet. no tunneling in the right of way. for the washer we will open up the sheetrock chip the exterior concrete grade beam slightly without cutting steel to allow for our new piping to go outside and down below grade on a 45 degree angle. we will do the same with the kitchen sink except instead of cutting sheetrock we will cut the inside bottom and back of the sink cabinet and repipe from the vent down and outside. outside we will collect both the washer line and kitchen sink line and run them to the existing yard line. we will cut some of the concrete patio to accomplish this. this book is an attempt to cover the questions asked by ms. bocanegra on my first attempt at this permit · 135 m away