810 Hollybluff St
Austin, TX 78753
Electrical panel changeout permitted at 810 Hollybluff St
An electrical permit for a main and sub panel changeout at 810 Hollybluff St was filed with the City of Austin on June 1, 2026. Permit 2026-065549 EP is listed as active.
Summarized from City of Austin records · updated Jun 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 1, 2026
- since Jun 1, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayMain and sub panel change out
- AppliedMay 22, 2026
- IssuedJun 1, 2026
- WorkJun '26 – Dec '26
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectMain and sub panel change out
Main and sub panel change out
City of Austin permitElectrical PermitActive- Record
- 2026-065549 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 810 Hollybluff St
What work is permitted at 810 Hollybluff St?
A City of Austin electrical permit covers a main and sub panel changeout at the address.
When was the electrical permit filed for 810 Hollybluff St?
The permit was filed on June 1, 2026.
What is the permit number for 810 Hollybluff St?
The permit number is 2026-065549 EP.
Is the 810 Hollybluff St permit active?
Yes. City of Austin records list permit 2026-065549 EP as active.
Is a new building being built at 810 Hollybluff St?
The available permit is for a main and sub panel changeout, not a new building.
Also being built nearby
All of 78753- 900 Hollybluff StApr 29, 2024Basilio - upgrade existing meter and braided wire · 30 m away
- 808 Hollybluff StMay 21, 2024Emergency - storm damage; rebuild and replace 125a overhead service and riser · 33 m away
- 806 Hollybluff StMay 21, 2024Emergency - storm damage; rebuild and replace 125a overhead service and riser · 62 m away
- 903 Hollybluff StNov 19, 2024We will replace the meter can riser and panel. we will add in surge protection and ground rods as well as bond the gas line to bring the service up to code · 75 m away
- 804 Hollybluff StJun 6, 2024Replace washer box replace faucet in master bath · 95 m away
- 905 Hollybluff StSep 9, 202465ft tunnel to repair drainage lines then a 35ft trench to repair the main sewer line · 99 m away
- 900 E Applegate DrJun 29, 202640 trench from homeowner cleanout to city tap to replace main building sewer line · 101 m away
- 806 E Applegate DrJul 16, 2024Replace damaged panel from storm house without power for 6 weeks with tenant inside emergency approval needed · 119 m away
- 904 E Applegate DrMay 7, 2026The 3/4 water line at the kitchen sink will be capped before it goes into the foundation. we will connect to the existing 3/4 hot water line in the attic and run a new 3/4 hot water line to the back to back bathrooms and will be drop new 1/2 hot lines to the back to back sinks master shower and the hall bathroom tub. this will eliminate the hot water system under the foundation · 133 m away
- 804 E Applegate DrAug 4, 2026Reper broken sewer line for restroom and reconcted from outside · 133 m away
- 906 E Applegate DrMar 31, 2026Replace a 4 cast iron waste and vent riser from the floor thru the roof. approximately 10 ft. total · 150 m away
- 908 Hollybluff StDec 30, 2025Customer had a four tags 1 four water heater gas line leaking removed any rusted fittings and replaced it with new black iron fittings. fireplace was leaking as well that was tagged there was a copper line feeding fireplace trace that back into the furnace closet using a half inch nipple and a half inch cap. i capped off tee that was feeding copper gas line. put the whole house on test at meter using a 1 inch bell reducer to three-quarter put the pressure at 15 psi it held for 20 minutes pulling inspection for job as well to ensure there are no leaks on the system · 151 m away