groundranger
Active · latest filing Sep 2026Residential

1010 E Applegate Dr

Austin, TX 78753

Energy storage planned for an existing solar system

City of Austin permits indicate an energy storage system is being added to an existing photovoltaic system at 1010 E Applegate Dr. The related electrical permit, 2026-115704 EP, was filed September 16, 2026; a separate permit for a transfer switch was filed August 24, 2026.

Summarized from City of Austin records · updated Sep 16, 2026

Projects
2
2 filings
Latest filing
Sep 16, 2026
since Aug 24, 2026
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Adding energy storage system to existing pv system

    Adding energy storage system to existing pv system

    City of Austin permitElectrical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Installation of transfer switch with 150 amp main on service with existing 150 amp panel and existing 200 amp meter can

    Installation of transfer switch with 150 amp main on service with existing 150 amp panel and existing 200 amp meter can

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1010 E Applegate Dr

What is being added at 1010 E Applegate Dr?

A City of Austin permit describes adding an energy storage system to an existing photovoltaic system. Permit 2026-115704 EP was filed September 16, 2026.

Is a new building being constructed at 1010 E Applegate Dr?

The records provided do not show a new building project. They show electrical work involving an existing solar system and a transfer switch.

What electrical work is permitted at 1010 E Applegate Dr?

The permits describe adding energy storage to an existing photovoltaic system and installing a transfer switch with a 150-amp main. The transfer-switch permit, 2026-104640 EP, was filed August 24, 2026.

When were permits filed for work at 1010 E Applegate Dr?

The transfer-switch permit was filed August 24, 2026, and is listed as final. The energy-storage permit was filed September 16, 2026, and is listed as active.

Is solar being installed at 1010 E Applegate Dr?

The permit description refers to adding energy storage to an existing photovoltaic system; it does not describe installing a new solar system.

Also being built nearby

All of 78753

More warehouses & industrial in 78753, solar installs in 78753.

Get alerts for 1010 E Applegate Dr