1202 Somerset Ave
Austin, TX 78753
1202 Somerset Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1202 Somerset Ave, Austin, TX 78753. The most recent, filed May 20, 2024, covers: “Cutover from septic to city sewer only”.
Compiled from City of Austin records · updated May 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 20, 2024
- since May 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledCutover from septic to city sewer only
- AppliedMay 15, 2024
- IssuedMay 20, 2024
- WorkMay '24 – May '24
- Final inspectionMay 23, 2024
Passed final inspection May 23, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectCutover from septic to city sewer only
Cutover from septic to city sewer only
City of Austin permitPlumbing PermitFinal- Record
- 2024-061225 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1202 Somerset Ave
What is being built at 1202 Somerset Ave?
The latest filing (City of Austin permit 2024-061225 PP, May 20, 2024) covers cutover from septic to city sewer only.
How many permits and filings does 1202 Somerset Ave have?
1 filing across 1 project, from May 20, 2024 to May 20, 2024.
Is there other construction near 1202 Somerset Ave?
Yes. Nearby filings include 1204 Somerset Ave (service upgrade, Jun 12, 2024); 1114 Hollybluff St (cutover from septic to city sewer only, Apr 16, 2025); 1202 E Applegate Dr (replacement of an existing water heater replace navien 210a2 gas tankless water heater location: exterior wall mount backyard, May 22, 2026).
How do I get alerts for new permits at 1202 Somerset Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1204 Somerset AveJun 12, 2024Service upgrade · 36 m away
- 1114 Hollybluff StApr 16, 2025Cutover from septic to city sewer only · 134 m away
- 1202 E Applegate DrMay 22, 2026Replacement of an existing water heater replace navien 210a2 gas tankless water heater location: exterior wall mount backyard · 138 m away
- 1113 Hollybluff StJul 1, 2024Cutover from septic to city sewer · 141 m away
- 1208 E Applegate DrJan 9, 2025Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 10622 Claywood DrMay 17, 2024Replacement of complete existing central heat and air system with or without duct work · 153 m away
- 1210 E Applegate DrFeb 12, 2026Replace 40ft sewer line 40ft each hot and cold and water lines and existing 50gal electric wh. all work will be performed inside of home. removing about 30sq ft of drywall to access lines · 157 m away
- 10613 Denell CirOct 23, 2026Perkin electrical services will remove and replace the existing electrical service equipment and upgrade the system to a new 200-amp electrical service · 161 m away
- 1109 Hollybluff StFeb 25, 2026Replace all underfloor waste and vent piping. for the 2 bathrooms washer and kitchen sink. to accomplish this we will demolition concrete excavate install have inspected backfill/compact and properly pour back the concrete with engineer approval/letter. approximately 60 x 15 of concrete demolition · 167 m away
- 1110 Hollybluff StJul 31, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 168 m away
- 10708 Claywood DrOct 16, 2026Base: installing a backup battery system and additional meter socket · 172 m away
- 10611 Denell CirMay 8, 2025Gas line repair · 177 m away