1105 Newport Ave
Austin, TX 78753
1105 Newport Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1105 Newport Ave, Austin, TX 78753. The most recent, filed May 29, 2024, covers: “Emergency replacement of damaged meter socket & riser”.
Compiled from City of Austin records · updated May 29, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 29, 2024
- since May 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency replacement of damaged meter socket & riser
- AppliedMay 29, 2024
- IssuedMay 29, 2024
- WorkMay '24 – Jun '24
- Final inspectionJun 4, 2024
Passed final inspection Jun 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency replacement of damaged meter socket & riser
Emergency replacement of damaged meter socket & riser
City of Austin permitElectrical PermitFinal- Record
- 2024-067452 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1105 Newport Ave
What is being built at 1105 Newport Ave?
The latest filing (City of Austin permit 2024-067452 EP, May 29, 2024) covers emergency replacement of damaged meter socket & riser.
How many permits and filings does 1105 Newport Ave have?
1 filing across 1 project, from May 29, 2024 to May 29, 2024.
Is there other construction near 1105 Newport Ave?
Yes. Nearby filings include 1107 Newport Ave (replacement of complete existing central heat and air system with or without duct work, Sep 9, 2026); 1104 Newport Ave (we are removing the old panel meter can and weather head. we are replacing the same with new. no other changes, Nov 9, 2026); 1102 Floradale Dr (cutover from septic to city sewer only, Aug 19, 2024).
How do I get alerts for new permits at 1105 Newport Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1107 Newport AveSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 32 m away
- 1104 Newport AveNov 9, 2026We are removing the old panel meter can and weather head. we are replacing the same with new. no other changes · 50 m away
- 1102 Floradale DrAug 19, 2024Cutover from septic to city sewer only · 56 m away
- 1109 Newport AveNov 12, 2025Tunnel from bathroom to bathroom 100 feet. open a hole behind master bathroom and another one behind guest bathroom to tunnel in. tunnel will go across under the house and connect to the kitchen sink on the way. make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. tear out all old cast iron and carry off. replace with schedule 40 pvc. it will run out from under the master bathroom and tie onto the main line. put in a new cleanout for the main and a new line running over to the main line in the yard. put in a new backwater valve in 4 pipe. run a new line for the washer/dryer and possibly a new vent and washer box. in bathrooms: install new p-traps and toilet flanges and reset all toilets. note: all 2 and 3 pvc will be hung at 4 foot intervals with stainless steel hangers · 64 m away
- 1108 Floradale DrJun 19, 2018Northacres sec 3 resubdivision · 84 m away
- 1101 Floradale DrJun 22, 2025Relocate tankless water heater · 95 m away
- 1010 Floradale DrNov 20, 2024Cutover from septic to city sewer only. 2024-150112 ww · 100 m away
- 1200 Newport AveMay 1, 202635 tunnel below the foundation to replace entire drain system. 1 access hole - back · 125 m away
- 1103 E Applegate DrDec 4, 2024Upgrade service to a 200amp service and change inside panel · 126 m away
- 1008 Floradale DrNov 13, 2024Replacement of condenser only condenser & coil · 129 m away
- 1201 Newport AveJun 28, 2024Express: repairs due to fire damage (like for like) · 129 m away
- 1112 Warrington DrNov 8, 2024Replacement of an existing water heater · 145 m away