1108 Floradale Dr
Austin, TX 78753
1108 Floradale Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 1108 Floradale Dr, Austin, TX 78753. The most recent, filed June 19, 2018, covers: “Irrigation installation”.
Compiled from City of Austin records · updated Jun 19, 2018
- Projects
- 3
- 3 filings
- Latest filing
- Jun 19, 2018
- since Jun 19, 2018
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredIrrigation installation
- AppliedJul 27, 2023
- IssuedJul 27, 2023
- !WorkJul '23 – Jan '24
- Final inspection
Marked expired Jan 24, 2024.
Permit & project history
3 projectsIrrigation installation
Irrigation installation
City of Austin permitPlumbing PermitExpired- Record
- 2023-095976 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Construct new driveway approach of 18.5 ft. no sidewalk inspection per plan review. *rs
Construct new driveway approach of 18.5 ft. no sidewalk inspection per plan review. *rs
City of Austin permitDriveway / SidewalksFinal- Record
- 2022-151212 DS
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1108 Floradale Dr
What is being built at 1108 Floradale Dr?
The latest filing (City of Austin permit 2023-095976 PP, July 27, 2023) covers irrigation installation.
How many permits and filings does 1108 Floradale Dr have?
3 filings across 3 projects, from June 19, 2018 to June 19, 2018.
Is there other construction near 1108 Floradale Dr?
Yes. Nearby filings include 1109 Newport Ave (tunnel from bathroom to bathroom 100 feet. open a hole behind master bathroom and another one behind guest bathroom to tunnel in. tunnel will go across under the house and connect to the kitchen sink on the way. make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. tear out all old cast iron and carry off. replace with schedule 40 pvc. it will run out from under the master bathroom and tie onto the main line. put in a new cleanout for the main and a new line running over to the main line in the yard. put in a new backwater valve in 4 pipe. run a new line for the washer/dryer and possibly a new vent and washer box. in bathrooms: install new p-traps and toilet flanges and reset all toilets. note: all 2 and 3 pvc will be hung at 4 foot intervals with stainless steel hangers, Nov 12, 2025); 1107 Newport Ave (replacement of complete existing central heat and air system with or without duct work, Sep 9, 2026); 1201 Newport Ave (express: repairs due to fire damage (like for like), Jun 28, 2024).
How do I get alerts for new permits at 1108 Floradale Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1109 Newport AveNov 12, 2025Tunnel from bathroom to bathroom 100 feet. open a hole behind master bathroom and another one behind guest bathroom to tunnel in. tunnel will go across under the house and connect to the kitchen sink on the way. make another hole in the garage floor in front of the washing machine and tunnel over to connect to main line. tear out all old cast iron and carry off. replace with schedule 40 pvc. it will run out from under the master bathroom and tie onto the main line. put in a new cleanout for the main and a new line running over to the main line in the yard. put in a new backwater valve in 4 pipe. run a new line for the washer/dryer and possibly a new vent and washer box. in bathrooms: install new p-traps and toilet flanges and reset all toilets. note: all 2 and 3 pvc will be hung at 4 foot intervals with stainless steel hangers · 48 m away
- 1107 Newport AveSep 9, 2026Replacement of complete existing central heat and air system with or without duct work · 63 m away
- 1201 Newport AveJun 28, 2024Express: repairs due to fire damage (like for like) · 74 m away
- 1105 Newport AveMay 29, 2024Emergency replacement of damaged meter socket & riser · 84 m away
- 1102 Floradale DrAug 19, 2024Cutover from septic to city sewer only · 101 m away
- 1112 Warrington DrNov 8, 2024Replacement of an existing water heater · 106 m away
- 1200 Newport AveMay 1, 202635 tunnel below the foundation to replace entire drain system. 1 access hole - back · 109 m away
- 1101 Floradale DrJun 22, 2025Relocate tankless water heater · 112 m away
- 1202 Newport AveJan 31, 2025Tunnel and replace the underfloor rusted out cast iron waste and vent piping for the bathrooms · 115 m away
- 1104 Newport AveNov 9, 2026We are removing the old panel meter can and weather head. we are replacing the same with new. no other changes · 118 m away
- 1204 Warrington DrAug 3, 2026Gritsch 39-91993 - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. 200 main breaker. upgrading revenue meter to 200 amps. upgrading subpanel to 200 amps. underground service requesting wire pull · 124 m away
- 1205 Newport AveMay 12, 2026Replacement of complete existing central heat and air system with or without duct work · 125 m away