groundranger
Recent · latest filing Oct 2025Residential

11306 Hornsby St

Austin, TX 78753

Plumbing and HVAC work permitted at 11306 Hornsby St

Permits indicate repairs to plumbing and the existing heating and air conditioning system at 11306 Hornsby St, rather than a new building. The City of Austin issued a mechanical permit on May 7, 2024, and a plumbing permit on October 20, 2025.

Summarized from City of Austin records · updated Oct 20, 2025

Projects
2
2 filings
Latest filing
Oct 20, 2025
since May 7, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

46 tunnel below the foundation to replace main bathrooms and utility branch drain line to kitchen drain lines.3 access holes - front back right. and 15 trench to repair yard sewer

  1. AppliedSep 30, 2025
  2. IssuedOct 20, 2025
  3. WorkOct '25 – Nov '25
  4. Final inspectionNov 14, 2025

Passed final inspection Nov 14, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. 46 tunnel below the foundation to replace main bathrooms and utility branch drain line to kitchen drain lines.3 access holes - front back right. and 15 trench to repair yard sewer

    46 tunnel below the foundation to replace main bathrooms and utility branch drain line to kitchen drain lines.3 access holes - front back right. and 15 trench to repair yard sewer

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11306 Hornsby St

What is being built at 11306 Hornsby St?

The permits indicate repairs to the existing home's plumbing and heating and air conditioning system. They do not describe a new building.

What plumbing work is permitted at 11306 Hornsby St?

Permit 2025-124505 PP, dated October 20, 2025, describes tunneling under the foundation to replace bathroom and drain lines, plus trenching to repair the yard sewer.

Was a new restaurant permitted at 11306 Hornsby St?

The available permits describe plumbing and mechanical work, not a new restaurant. The latest filing is plumbing permit 2025-124505 PP, dated October 20, 2025.

What HVAC work is planned at 11306 Hornsby St?

Mechanical permit 2024-055636 MP, issued May 7, 2024, describes replacing the existing central heating and air conditioning system, with or without ductwork.

What work is happening near Austin Independent School District on West Braker Lane?

At 11306 Hornsby St, 119 meters from the Austin Independent School District address listed at 401 W Braker Lane, permits indicate plumbing and HVAC repairs. The records do not indicate that the work is connected to the school.

Also being built nearby

All of 78753

More restaurants in 78753.

Email me when a new permit is filed