11307 Hornsby St
Austin, TX 78753
Gas line repairs and testing permitted at 11307 Hornsby St
A plumbing permit at 11307 Hornsby St covers repairs to a gas line and testing after a red tag. The City of Austin record was filed July 16, 2026, and is marked final.
Summarized from City of Austin records · updated Jul 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 16, 2026
- since Jul 16, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRed tag gas line will make correct repairs and test
- AppliedJul 13, 2026
- IssuedJul 16, 2026
- WorkJul '26 – Jul '26
- Final inspectionJul 20, 2026
Passed final inspection Jul 20, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRed tag gas line will make correct repairs and test
Red tag gas line will make correct repairs and test
City of Austin permitPlumbing PermitFinal- Record
- 2026-089470 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11307 Hornsby St
What is being done at 11307 Hornsby St?
A City of Austin plumbing permit covers gas-line repairs and testing after a red tag. The permit, 2026-089470 PP, was filed July 16, 2026.
Is a new home being built at 11307 Hornsby St?
The record provided is for gas-line repairs and testing, not new-home construction.
When was the permit filed for 11307 Hornsby St?
The City of Austin filed permit 2026-089470 PP on July 16, 2026. Its status is final.
What is being repaired near Austin Independent School District at 401 W Braker Lane?
The permit at 11307 Hornsby St covers gas-line repairs and testing after a red tag. The listed Austin Independent School District location is 149 meters away.
What work is happening near Foundation Communities on West Braker Lane?
A plumbing permit at 11307 Hornsby St covers gas-line repairs and testing. The listed Foundation Communities location at 601 West Braker Lane is 209 meters away.
Also being built nearby
All of 78753- 11306 Hornsby StOct 20, 202546 tunnel below the foundation to replace main bathrooms and utility branch drain line to kitchen drain lines.3 access holes - front back right. and 15 trench to repair yard sewer · 54 m away
- 11303 Hornsby StFeb 2, 2026Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 11308 Hornsby StJun 9, 2026Replace wastewater yard line from clean out at house to city tap 120 ft · 64 m away
- 11305 Hunters LnAug 30, 2024Replace electrical service riser (worn out seu cable) install new meter can and electrical panel · 111 m away
- 11405 Hornsby StOct 8, 2026Interior remodel and garage conversion- remove walls to open floorplan. replace flooring and interior design. enclose part of garage for laundry. replace windows and doors · 117 m away
- 11407 Hornsby StMar 31, 2026Replacing cast iron pipes with pvc pipes and running a main building sewer line to the city. per contractor agent the project involves replacing an aging cast iron plumbing system located beneath the home by tunneling under the foundation. this method allows access to the existing sewer lines without the need to disturb or remove interior flooring. a tunnel will be carefully excavated beneath the structure to expose the old cast iron pipes which have likely deteriorated over time due to corrosion scaling and potential cracking. once exposed the outdated cast iron piping will be removed and replaced with new durable pvc piping. pvc (polyvinyl chloride) is resistant to corrosion has a longer lifespan and provides improved flow efficiency compared to cast iron. the new system will be installed to meet current plumbing codes and ensure reliable wastewater drainage. in addition the property will be transitioned from an outdated backyard septic system to the municipal sewer system. this will involve connecting the new pvc plumbing to the city sewer line ensuring proper alignment grading and compliance with local regulations. the septic system will be properly abandoned according to code. this upgrade will provide a more efficient low-maintenance and environmentally compliant wastewater solution for the home. the job will take place in the front side of the house and underneath · 132 m away
- 11403 Hunters LnMay 28, 2025Replacement of complete existing central heat and air system with or without duct work · 134 m away
- 401 W Braker Lane · Austin Independent School DistrictJan 9, 2024Secure vestibule at walnut creek elementary school — renovation/alteration — addition of new secure vestibule at main entrance of school · 149 m away
- 11306 Hilltop StOct 1, 2024Replacement of overhead service · 154 m away
- 11302 Hilltop StJun 7, 2024Home performance with energy star job with a/c replacement and duct replacement · 166 m away
- 11309 Tedford StFeb 19, 2025Replacing front yard water line also replacing the main sewer system *replaced sewer pipes under the house · 168 m away
- 11408 Hunters LnJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 172 m away