11408 Hunters Ln
Austin, TX 78753
11408 Hunters Ln: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11408 Hunters Ln, Austin, TX 78753. The most recent, filed June 13, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Jun 13, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Jun 13, 2024
- since Jun 13, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work
- AppliedJun 11, 2024
- IssuedJun 13, 2024
- WorkJun '24 – Aug '24
- Final inspectionAug 7, 2024
Passed final inspection Aug 7, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-073737 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2023-067113 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11408 Hunters Ln
What is being built at 11408 Hunters Ln?
The latest filing (City of Austin permit 2024-073737 MP, June 13, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 11408 Hunters Ln have?
2 filings across 2 projects, from June 13, 2024 to June 13, 2024.
Is there other construction near 11408 Hunters Ln?
Yes. Nearby filings include 11500 Hunters Ln (request to disconnect -replace existing 125 amp meter can with a new 200 amp meter can -add new service riser -add new 200a main service panel with 200 amp main circuit breaker -replace existing sub panel with new 200 amp panel, Aug 6, 2025); 11504 Hunters Ln (replacement of complete existing central heat and air system with or without duct work, Jan 9, 2025); 11407 Hornsby St (replacing cast iron pipes with pvc pipes and running a main building sewer line to the city. per contractor agent the project involves replacing an aging cast iron plumbing system located beneath the home by tunneling under the foundation. this method allows access to the existing sewer lines without the need to disturb or remove interior flooring. a tunnel will be carefully excavated beneath the structure to expose the old cast iron pipes which have likely deteriorated over time due to corrosion scaling and potential cracking. once exposed the outdated cast iron piping will be removed and replaced with new durable pvc piping. pvc (polyvinyl chloride) is resistant to corrosion has a longer lifespan and provides improved flow efficiency compared to cast iron. the new system will be installed to meet current plumbing codes and ensure reliable wastewater drainage. in addition the property will be transitioned from an outdated backyard septic system to the municipal sewer system. this will involve connecting the new pvc plumbing to the city sewer line ensuring proper alignment grading and compliance with local regulations. the septic system will be properly abandoned according to code. this upgrade will provide a more efficient low-maintenance and environmentally compliant wastewater solution for the home. the job will take place in the front side of the house and underneath, Mar 31, 2026).
How do I get alerts for new permits at 11408 Hunters Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11500 Hunters LnAug 6, 2025Request to disconnect -replace existing 125 amp meter can with a new 200 amp meter can -add new service riser -add new 200a main service panel with 200 amp main circuit breaker -replace existing sub panel with new 200 amp panel · 22 m away
- 11504 Hunters LnJan 9, 2025Replacement of complete existing central heat and air system with or without duct work · 50 m away
- 11407 Hornsby StMar 31, 2026Replacing cast iron pipes with pvc pipes and running a main building sewer line to the city. per contractor agent the project involves replacing an aging cast iron plumbing system located beneath the home by tunneling under the foundation. this method allows access to the existing sewer lines without the need to disturb or remove interior flooring. a tunnel will be carefully excavated beneath the structure to expose the old cast iron pipes which have likely deteriorated over time due to corrosion scaling and potential cracking. once exposed the outdated cast iron piping will be removed and replaced with new durable pvc piping. pvc (polyvinyl chloride) is resistant to corrosion has a longer lifespan and provides improved flow efficiency compared to cast iron. the new system will be installed to meet current plumbing codes and ensure reliable wastewater drainage. in addition the property will be transitioned from an outdated backyard septic system to the municipal sewer system. this will involve connecting the new pvc plumbing to the city sewer line ensuring proper alignment grading and compliance with local regulations. the septic system will be properly abandoned according to code. this upgrade will provide a more efficient low-maintenance and environmentally compliant wastewater solution for the home. the job will take place in the front side of the house and underneath · 55 m away
- 11405 Hornsby StOct 8, 2026Interior remodel and garage conversion- remove walls to open floorplan. replace flooring and interior design. enclose part of garage for laundry. replace windows and doors · 64 m away
- 11503 Hornsby StMay 30, 2024Install/replace up to 200 amp meter and riser · 76 m away
- 11403 Hunters LnMay 28, 2025Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 11408 Hornsby StJun 17, 2026537 sq ft addition of bedroom and bathroom expired permit 2023-108682 bp (express replace windows as needed) rolled into current scope of work · 101 m away
- 11505 Hunters LnAug 12, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 4 ton 14 seer2 straight cool · 102 m away
- 402 W Scurry StMar 19, 2026Replace outdoor panel with new and updated equipment whole home surge protector and grounding system · 135 m away
- 11404 Hilltop StFeb 20, 2024Repair to sewerline under house via tunnel · 148 m away
- 11308 Hornsby StJun 9, 2026Replace wastewater yard line from clean out at house to city tap 120 ft · 161 m away
- 11602 Hornsby StAug 8, 2025Whole home rewire & install/replace 200 amp main breaker panel and meter can (overhead) · 170 m away