11503 Hornsby St
Austin, TX 78753
11503 Hornsby St: 1 project on record
City of Austin lists 1 filing across 1 project at 11503 Hornsby St, Austin, TX 78753. The most recent, filed May 30, 2024, covers: “Install/replace up to 200 amp meter and riser”.
Compiled from City of Austin records · updated May 30, 2024
- Projects
- 1
- 1 filings
- Latest filing
- May 30, 2024
- since May 30, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall/replace up to 200 amp meter and riser
- AppliedMay 29, 2024
- IssuedMay 30, 2024
- WorkMay '24 – Jun '24
- Final inspectionJun 13, 2024
Passed final inspection Jun 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall/replace up to 200 amp meter and riser
Install/replace up to 200 amp meter and riser
City of Austin permitElectrical PermitFinal- Record
- 2024-067435 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11503 Hornsby St
What is being built at 11503 Hornsby St?
The latest filing (City of Austin permit 2024-067435 EP, May 30, 2024) covers install/replace up to 200 amp meter and riser.
How many permits and filings does 11503 Hornsby St have?
1 filing across 1 project, from May 30, 2024 to May 30, 2024.
Is there other construction near 11503 Hornsby St?
Yes. Nearby filings include 11504 Hunters Ln (replacement of complete existing central heat and air system with or without duct work, Jan 9, 2025); 11500 Hunters Ln (request to disconnect -replace existing 125 amp meter can with a new 200 amp meter can -add new service riser -add new 200a main service panel with 200 amp main circuit breaker -replace existing sub panel with new 200 amp panel, Aug 6, 2025); 11408 Hunters Ln (replacement of complete existing central heat and air system with or without duct work, Jun 13, 2024).
How do I get alerts for new permits at 11503 Hornsby St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11504 Hunters LnJan 9, 2025Replacement of complete existing central heat and air system with or without duct work · 48 m away
- 11500 Hunters LnAug 6, 2025Request to disconnect -replace existing 125 amp meter can with a new 200 amp meter can -add new service riser -add new 200a main service panel with 200 amp main circuit breaker -replace existing sub panel with new 200 amp panel · 61 m away
- 11408 Hunters LnJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 76 m away
- 402 W Scurry StMar 19, 2026Replace outdoor panel with new and updated equipment whole home surge protector and grounding system · 93 m away
- 11602 Hornsby StAug 8, 2025Whole home rewire & install/replace 200 amp main breaker panel and meter can (overhead) · 94 m away
- 11408 Hornsby StJun 17, 2026537 sq ft addition of bedroom and bathroom expired permit 2023-108682 bp (express replace windows as needed) rolled into current scope of work · 95 m away
- 11407 Hornsby StMar 31, 2026Replacing cast iron pipes with pvc pipes and running a main building sewer line to the city. per contractor agent the project involves replacing an aging cast iron plumbing system located beneath the home by tunneling under the foundation. this method allows access to the existing sewer lines without the need to disturb or remove interior flooring. a tunnel will be carefully excavated beneath the structure to expose the old cast iron pipes which have likely deteriorated over time due to corrosion scaling and potential cracking. once exposed the outdated cast iron piping will be removed and replaced with new durable pvc piping. pvc (polyvinyl chloride) is resistant to corrosion has a longer lifespan and provides improved flow efficiency compared to cast iron. the new system will be installed to meet current plumbing codes and ensure reliable wastewater drainage. in addition the property will be transitioned from an outdated backyard septic system to the municipal sewer system. this will involve connecting the new pvc plumbing to the city sewer line ensuring proper alignment grading and compliance with local regulations. the septic system will be properly abandoned according to code. this upgrade will provide a more efficient low-maintenance and environmentally compliant wastewater solution for the home. the job will take place in the front side of the house and underneath · 102 m away
- 11505 Hunters LnAug 12, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 4 ton 14 seer2 straight cool · 102 m away
- 11405 Hornsby StOct 8, 2026Interior remodel and garage conversion- remove walls to open floorplan. replace flooring and interior design. enclose part of garage for laundry. replace windows and doors · 117 m away
- 303 W Caddo StNov 21, 2024Express: window replacement (one window like for like) · 142 m away
- 204 W Covington DrAug 28, 2024Replacement of complete existing central heat and air system with or without duct work · 143 m away
- 11606 Hornsby StNov 21, 2025Residential rooftop solar on existing residence · 150 m away