11310 April Dr
Austin, TX 78753
11310 April Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11310 April Dr, Austin, TX 78753. The most recent, filed June 18, 2024, covers: “New lawn irrigation system”.
Compiled from City of Austin records · updated Jun 18, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 18, 2024
- since Jun 18, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNew lawn irrigation system
- AppliedJun 17, 2024
- IssuedJun 18, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 16, 2024
Passed final inspection Jul 16, 2024.
Permit & project history
1 projectNew lawn irrigation system
New lawn irrigation system
City of Austin permitPlumbing PermitFinal- Record
- 2024-076284 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11310 April Dr
What is being built at 11310 April Dr?
The latest filing (City of Austin permit 2024-076284 PP, June 18, 2024) covers new lawn irrigation system.
How many permits and filings does 11310 April Dr have?
1 filing across 1 project, from June 18, 2024 to June 18, 2024.
Is there other construction near 11310 April Dr?
Yes. Nearby filings include 11308 April Dr (replacement of complete existing central heat and air system with or without duct work, Jul 22, 2024); 11306 April Dr (replacement of an existing water heater replace gas water heater like for like, Mar 30, 2026); 1303 March Dr (replacement of complete existing central heat and air system with or without duct work, Mar 18, 2025).
How do I get alerts for new permits at 11310 April Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11308 April DrJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 25 m away
- 11306 April DrMar 30, 2026Replacement of an existing water heater replace gas water heater like for like · 48 m away
- 1303 March DrMar 18, 2025Replacement of complete existing central heat and air system with or without duct work · 91 m away
- 1309 September DrMay 20, 2026Express: foundation repair · 110 m away
- 1311 September DrMay 29, 2024200 amp service upgrade · 116 m away
- 11303 April DrOct 15, 20256.44kw rooftop solar installation · 118 m away
- 1315 September DrFeb 26, 2025Service upgrade and ocpp- ev charger · 123 m away
- 1313 September DrFeb 13, 2024Replacement of an existing water heater · 126 m away
- 1302 March DrMay 6, 2025Excavate 25 tunnel to repair main drain line under house serving one bathroom · 144 m away
- 1305 August DrFeb 27, 2026Install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment · 146 m away
- 11309 June DrFeb 1, 2024Replacement of complete existing central heat and air system with or without duct work · 155 m away
- 1300 August DrOct 22, 2024We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same · 168 m away