groundranger
Historic · latest filing Oct 2024Residential

1300 August Dr

Austin, TX 78753

1300 August Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 1300 August Dr, Austin, TX 78753. The most recent, filed October 22, 2024, covers: “We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same”.

Compiled from City of Austin records · updated Oct 22, 2024

Projects
1
1 filings
Latest filing
Oct 22, 2024
since Oct 22, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same

  1. AppliedSep 11, 2024
  2. IssuedOct 22, 2024
  3. WorkOct '24 – Jun '25
  4. Final inspectionJun 12, 2025

Passed final inspection Jun 12, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same

    We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1300 August Dr

What is being built at 1300 August Dr?

The latest filing (City of Austin permit 2024-123224 EP, October 22, 2024) covers we are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same.

How many permits and filings does 1300 August Dr have?

1 filing across 1 project, from October 22, 2024 to October 22, 2024.

Is there other construction near 1300 August Dr?

Yes. Nearby filings include 11400 March Dr (90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left, Sep 17, 2025); 1305 August Dr (install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment, Feb 27, 2026); 11403 March Dr (replacement of an existing water heater, Aug 28, 2025).

How do I get alerts for new permits at 1300 August Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed