groundranger
Recent · latest filing Sep 2025Residential

11400 March Dr

Austin, TX 78753

11400 March Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 11400 March Dr, Austin, TX 78753. The most recent, filed September 17, 2025, covers: “90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left”.

Compiled from City of Austin records · updated Sep 17, 2025

Projects
1
1 filings
Latest filing
Sep 17, 2025
since Sep 17, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left

  1. AppliedSep 10, 2025
  2. IssuedSep 17, 2025
  3. WorkSep '25 – Oct '25
  4. Final inspectionOct 10, 2025

Passed final inspection Oct 10, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left

    90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 11400 March Dr

What is being built at 11400 March Dr?

The latest filing (City of Austin permit 2025-115014 PP, September 17, 2025) covers 90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left.

How many permits and filings does 11400 March Dr have?

1 filing across 1 project, from September 17, 2025 to September 17, 2025.

Is there other construction near 11400 March Dr?

Yes. Nearby filings include 1300 August Dr (we are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same, Oct 22, 2024); 1305 August Dr (install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment, Feb 27, 2026); 11403 March Dr (replacement of an existing water heater, Aug 28, 2025).

How do I get alerts for new permits at 11400 March Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed