1309 August Dr
Austin, TX 78753
1309 August Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1309 August Dr, Austin, TX 78753. The most recent, filed March 19, 2025, covers: “Emergency ae pulled meter replaced damaged material riser and meter”.
Compiled from City of Austin records · updated Mar 19, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 19, 2025
- since Mar 19, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledEmergency ae pulled meter replaced damaged material riser and meter
- AppliedMar 5, 2025
- IssuedMar 19, 2025
- WorkMar '25 – Apr '25
- Final inspectionJun 23, 2025
Passed final inspection Jun 23, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectEmergency ae pulled meter replaced damaged material riser and meter
Emergency ae pulled meter replaced damaged material riser and meter
City of Austin permitElectrical PermitFinal- Record
- 2025-026617 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1309 August Dr
What is being built at 1309 August Dr?
The latest filing (City of Austin permit 2025-026617 EP, March 19, 2025) covers emergency ae pulled meter replaced damaged material riser and meter.
How many permits and filings does 1309 August Dr have?
1 filing across 1 project, from March 19, 2025 to March 19, 2025.
Is there other construction near 1309 August Dr?
Yes. Nearby filings include 1305 August Dr (install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment, Feb 27, 2026); 11403 March Dr (replacement of an existing water heater, Aug 28, 2025); 11400 March Dr (90 tunnel below the foundation to replace entire drain system. 3 access holes. back right left, Sep 17, 2025).
How do I get alerts for new permits at 1309 August Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1305 August DrFeb 27, 2026Install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment · 48 m away
- 11403 March DrAug 28, 2025Replacement of an existing water heater · 66 m away
- 11400 March DrSep 17, 202590 tunnel below the foundation to replace entire drain system. 3 access holes. back right left · 76 m away
- 11409 June DrJul 14, 2025Express: foundation repair · 106 m away
- 1300 August DrOct 22, 2024We are updating the current meter socket and changing the overhead service to underground. we will not be upgrading anything for the main panel other than adding proper grounding and surge with the meter swap. size of service will stay the same · 110 m away
- 11501 March DrOct 18, 2024Replacement of mini-split system · 119 m away
- 1302 March DrMay 6, 2025Excavate 25 tunnel to repair main drain line under house serving one bathroom · 123 m away
- 1303 March DrMar 18, 2025Replacement of complete existing central heat and air system with or without duct work · 130 m away
- 11502 March DrApr 15, 2026Replacement of complete existing central heat and air system with or without duct work upflow located in hallway closet · 151 m away
- 11310 April DrJun 18, 2024New lawn irrigation system · 181 m away
- 11308 April DrJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 194 m away
- 11506 March DrJun 12, 2024Deinstall/reinstall of existing solar system. ae. no changes being made · 194 m away