11409 June Dr
Austin, TX 78753
11409 June Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11409 June Dr, Austin, TX 78753. The most recent, filed July 14, 2025, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Jul 14, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 14, 2025
- since Jul 14, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedJul 7, 2025
- IssuedJul 14, 2025
- WorkJul '25 – Sep '25
- Final inspectionSep 5, 2025
Passed final inspection Sep 5, 2025.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2025-083676 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11409 June Dr
What is being built at 11409 June Dr?
The latest filing (City of Austin permit 2025-083676 BP, July 14, 2025) covers express: foundation repair.
How many permits and filings does 11409 June Dr have?
1 filing across 1 project, from July 14, 2025 to July 14, 2025.
Is there other construction near 11409 June Dr?
Yes. Nearby filings include 1302 March Dr (excavate 25 tunnel to repair main drain line under house serving one bathroom, May 6, 2025); 1303 March Dr (replacement of complete existing central heat and air system with or without duct work, Mar 18, 2025); 1309 August Dr (emergency ae pulled meter replaced damaged material riser and meter, Mar 19, 2025).
How do I get alerts for new permits at 11409 June Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 1302 March DrMay 6, 2025Excavate 25 tunnel to repair main drain line under house serving one bathroom · 43 m away
- 1303 March DrMar 18, 2025Replacement of complete existing central heat and air system with or without duct work · 90 m away
- 1309 August DrMar 19, 2025Emergency ae pulled meter replaced damaged material riser and meter · 106 m away
- 1305 August DrFeb 27, 2026Install/replace 200 amp main breaker panel and meter can(overhead) service riser with weather head and point of attachment · 130 m away
- 11508 June DrMar 25, 202565 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front back back · 142 m away
- 11303 April DrOct 15, 20256.44kw rooftop solar installation · 143 m away
- 11513 June DrOct 26, 2026Gas test. gas lines inspection · 160 m away
- 11510 June DrDec 19, 2025Replacement of complete existing central heat and air system with or without duct work · 162 m away
- 11403 March DrAug 28, 2025Replacement of an existing water heater · 169 m away
- 11400 March DrSep 17, 202590 tunnel below the foundation to replace entire drain system. 3 access holes. back right left · 177 m away
- 11308 April DrJul 22, 2024Replacement of complete existing central heat and air system with or without duct work · 179 m away
- 11310 April DrJun 18, 2024New lawn irrigation system · 179 m away