11512 Spring Hill Dr
Austin, TX 78753
Drain line replacement permitted at 11512 Spring Hill Dr
A City of Austin plumbing permit indicates work to replace the hall bathroom drain line using a 10-foot tunnel beneath the foundation and one access hole. The permit was filed on February 3, 2026, and its status is listed as Final.
Summarized from City of Austin records · updated Feb 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled10 tunnel below the foundation to replace hall bathroom drain line. 1 access hole
- AppliedJan 5, 2026
- IssuedFeb 3, 2026
- WorkFeb '26 – Mar '26
- Final inspectionMar 4, 2026
Passed final inspection Mar 4, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project10 tunnel below the foundation to replace hall bathroom drain line. 1 access hole
10 tunnel below the foundation to replace hall bathroom drain line. 1 access hole
City of Austin permitPlumbing PermitFinal- Record
- 2026-000783 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11512 Spring Hill Dr
What work is planned at 11512 Spring Hill Dr?
A City of Austin plumbing permit describes replacing the hall bathroom drain line through a 10-foot tunnel beneath the foundation, with one access hole. The permit was filed February 3, 2026.
Is a new home being built at 11512 Spring Hill Dr?
The available permit is for plumbing work, not new-home construction. It describes replacing a hall bathroom drain line.
When was the plumbing permit filed for 11512 Spring Hill Dr?
The City of Austin permit, number 2026-000783 PP, was filed on February 3, 2026.
What does permit 2026-000783 PP cover?
The permit covers a 10-foot tunnel beneath the foundation to replace the hall bathroom drain line, with one access hole. Its status is listed as Final.
Is the work at 11512 Spring Hill Dr a major construction project?
The available record describes a plumbing repair to replace a hall bathroom drain line. It does not provide a project valuation or square footage.
Also being built nearby
All of 78753- 11516 Spring Hill DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 24 m away
- 11518 Spring Hill DrApr 14, 2025Install level 2 ev charger · 48 m away
- 802 Riddlewood DrMay 12, 202640 foot tunnel under home to repair line. **1 access at the cleanout behind the house and 40 feet of tunnel under the home to replace a drain line · 67 m away
- 11507 Oak TrlMar 8, 2024Replacing 125amp service like for like · 79 m away
- 11506 Oak TrlNov 18, 2025Upgrading existing oh service meter riser panel grounding and surge protector · 101 m away
- 11600 Oak TrlMar 11, 2025Replacing 125amp panel like for like · 102 m away
- 11601 Oak Haven CvJun 11, 2026Express- existing foundation repair as per scope of work attached · 109 m away
- 11509 North Oaks DrSep 4, 2025Replacement of mini-split system install 9k mitsubishi to garage · 132 m away
- 11507 North Oaks DrMay 24, 2024Replacement of an existing water heater · 137 m away
- 11606 Oak TrlOct 24, 2025Replace homeowner shut off valve prv · 161 m away
- 11501 North Oaks DrJul 22, 2026Service upgrade · 173 m away
- 11605 Oak Haven CvJun 20, 2025Upgrade existing service from 100a to 200a · 178 m away