802 Riddlewood Dr
Austin, TX 78753
40-foot tunnel permitted for drain-line repair under Austin home
A 40-foot tunnel under the home is planned to replace a drain line, according to a City of Austin plumbing permit filed May 12, 2026. The permit describes one access point at the cleanout behind the house and is marked final.
Summarized from City of Austin records · updated May 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 12, 2026
- since May 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled40 foot tunnel under home to repair line. **1 access at the cleanout behind the house and 40 feet of tunnel under the home to replace a drain line
- AppliedMay 6, 2026
- IssuedMay 12, 2026
- WorkMay '26 – May '26
- Final inspectionMay 27, 2026
Passed final inspection May 27, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project40 foot tunnel under home to repair line. **1 access at the cleanout behind the house and 40 feet of tunnel under the home to replace a drain line
40 foot tunnel under home to repair line. **1 access at the cleanout behind the house and 40 feet of tunnel under the home to replace a drain line
City of Austin permitPlumbing PermitFinal- Record
- 2026-056911 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 802 Riddlewood Dr
What is being built at 802 Riddlewood Dr?
A 40-foot tunnel under the home is planned to replace a drain line. The City of Austin permit was filed May 12, 2026.
Why is there a tunnel planned under the house?
The permit says the tunnel will provide access to replace a drain line.
How long is the tunnel at 802 Riddlewood Dr?
The permit describes a 40-foot tunnel under the home.
Where will workers access the tunnel?
The permit describes one access point at the cleanout behind the house.
When was the drain-line repair permitted?
The City of Austin filed plumbing permit 2026-056911 PP on May 12, 2026. The permit record is marked final.
Also being built nearby
All of 78753- 11518 Spring Hill DrApr 14, 2025Install level 2 ev charger · 49 m away
- 11601 Oak Haven CvJun 11, 2026Express- existing foundation repair as per scope of work attached · 52 m away
- 11516 Spring Hill DrOct 28, 2026Base: installing a backup battery system and additional meter socket · 54 m away
- 11512 Spring Hill DrFeb 3, 202610 tunnel below the foundation to replace hall bathroom drain line. 1 access hole · 67 m away
- 11605 Oak Haven CvJun 20, 2025Upgrade existing service from 100a to 200a · 121 m away
- 11600 Oak TrlMar 11, 2025Replacing 125amp panel like for like · 134 m away
- 908 Riddlewood DrMay 7, 2024Bathroom remodel adding recessed cans relocating outlets and current light fixtures moving switch box · 144 m away
- 11507 Oak TrlMar 8, 2024Replacing 125amp service like for like · 145 m away
- 11606 Oak TrlOct 24, 2025Replace homeowner shut off valve prv · 162 m away
- 11506 Oak TrlNov 18, 2025Upgrading existing oh service meter riser panel grounding and surge protector · 167 m away
- 910 Riddlewood DrOct 30, 2024Excavate 25 trench to repair main drain line in yard · 168 m away
- 11608 Oak TrlMay 22, 2026Replacement of complete existing central heat and air system with or without duct work · 177 m away