11800 Bowery Pl
Austin, TX 78753
11800 Bowery Pl: 2 projects on record
City of Austin lists 2 filings across 2 projects at 11800 Bowery Pl, Austin, TX 78753 since October 28, 2024. The most recent, filed December 2, 2024, covers: “Install new 13.5kw energy storage system for existing residential only”.
Compiled from City of Austin records · updated Dec 2, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Dec 2, 2024
- since Oct 28, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall new 13.5kw energy storage system for existing residential only
- AppliedNov 20, 2024
- IssuedDec 2, 2024
- WorkDec '24 – May '25
- Final inspectionFeb 25, 2025
Passed final inspection Feb 25, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsInstall new 13.5kw energy storage system for existing residential only
Install new 13.5kw energy storage system for existing residential only
City of Austin permitElectrical PermitFinal- Record
- 2024-154342 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
Request to disconnect contractor temporarily disconnect required to tie in pv/ess components. we are not upgrading the size of the service not upgrading the meter size
City of Austin permitElectrical PermitFinal- Record
- 2024-141072 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11800 Bowery Pl
What is being built at 11800 Bowery Pl?
The latest filing (City of Austin permit 2024-154342 EP, December 2, 2024) covers install new 13.5kw energy storage system for existing residential only.
How many permits and filings does 11800 Bowery Pl have?
2 filings across 2 projects, from October 28, 2024 to December 2, 2024.
Is there other construction near 11800 Bowery Pl?
Yes. Nearby filings include 11804 Bowery Pl (tunnel below the foundation to repair multiple breaks and bellies below master bathroom to main line connection, Apr 29, 2024); 11816 Bowery Pl (change from tank to tankless, Apr 15, 2025); 505 Bowery Trl (replacement of an existing water heater installation of 50 gallon natural gas water heater, Feb 18, 2026).
How do I get alerts for new permits at 11800 Bowery Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 11804 Bowery PlApr 29, 2024Tunnel below the foundation to repair multiple breaks and bellies below master bathroom to main line connection · 19 m away
- 11816 Bowery PlApr 15, 2025Change from tank to tankless · 72 m away
- 505 Bowery TrlFeb 18, 2026Replacement of an existing water heater installation of 50 gallon natural gas water heater · 75 m away
- 516 Bowery TrlApr 13, 2026Express: replacing 8 windows like for like in an existing residential home · 132 m away
- 816 Walnut Creek DrOct 6, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 167 m away
- 806 Walnut Creek DrFeb 27, 2025Express: replacing 2 windows like for like · 182 m away
- 12021-1/2 IH 35 SvrdMar 9, 2026Dupius bowery 2 project assessment · 193 m away
- 705 Clear Stream XingJun 14, 2024Install ev charger · 213 m away
- 12009-1/2 IH 35 SvrdJun 23, 2014Springs of walnut creek - phase 3 · 219 m away
- 11900 Natures BndJul 28, 2025Installation of an ev charger in the garage · 220 m away
- 819 Walnut Creek DrAug 5, 2024Replacement of complete existing central heat and air system with or without duct work · 246 m away
- 824 Walnut Creek DrNov 15, 2023Replacement of complete existing central heat and air system with or without duct work · 247 m away
More warehouses & industrial in 78753, solar installs in 78753.