11816 Bowery Pl
Austin, TX 78753
11816 Bowery Pl: 1 project on record
City of Austin lists 1 filing across 1 project at 11816 Bowery Pl, Austin, TX 78753. The most recent, filed April 15, 2025, covers: “Change from tank to tankless”.
Compiled from City of Austin records · updated Apr 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Apr 15, 2025
- since Apr 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledChange from tank to tankless
- AppliedDec 9, 2024
- IssuedApr 15, 2025
- WorkApr '25 – Apr '25
- Final inspectionApr 18, 2025
Passed final inspection Apr 18, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectChange from tank to tankless
Change from tank to tankless
City of Austin permitPlumbing PermitFinal- Record
- 2024-160703 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11816 Bowery Pl
What is being built at 11816 Bowery Pl?
The latest filing (City of Austin permit 2024-160703 PP, April 15, 2025) covers change from tank to tankless.
How many permits and filings does 11816 Bowery Pl have?
1 filing across 1 project, from April 15, 2025 to April 15, 2025.
Is there other construction near 11816 Bowery Pl?
Yes. Nearby filings include 505 Bowery Trl (replacement of an existing water heater installation of 50 gallon natural gas water heater, Feb 18, 2026); 11804 Bowery Pl (tunnel below the foundation to repair multiple breaks and bellies below master bathroom to main line connection, Apr 29, 2024); 11800 Bowery Pl (install new 13.5kw energy storage system for existing residential only, Dec 2, 2024).
How do I get alerts for new permits at 11816 Bowery Pl?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 505 Bowery TrlFeb 18, 2026Replacement of an existing water heater installation of 50 gallon natural gas water heater · 46 m away
- 11804 Bowery PlApr 29, 2024Tunnel below the foundation to repair multiple breaks and bellies below master bathroom to main line connection · 57 m away
- 11800 Bowery PlDec 2, 2024Install new 13.5kw energy storage system for existing residential only · 72 m away
- 516 Bowery TrlApr 13, 2026Express: replacing 8 windows like for like in an existing residential home · 113 m away
- 12021-1/2 IH 35 SvrdMar 9, 2026Dupius bowery 2 project assessment · 153 m away
- 11900 Natures BndJul 28, 2025Installation of an ev charger in the garage · 191 m away
- 705 Clear Stream XingJun 14, 2024Install ev charger · 208 m away
- 11905 Natures BndJun 20, 2024Replacement of complete existing central heat and air system with or without duct work · 233 m away
- 806 Walnut Creek DrFeb 27, 2025Express: replacing 2 windows like for like · 233 m away
- 12009-1/2 IH 35 SvrdJun 23, 2014Springs of walnut creek - phase 3 · 237 m away
- 816 Walnut Creek DrOct 6, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 239 m away
- 11916 Natures BndFeb 17, 2026Replacement of an existing water heater change out: install/ replace 50 gallon tank-type natural gas water heater · 245 m away