1205 Crupp Ct
Austin, TX 78753
Home bathroom and electrical upgrades at 1205 Crupp Ct
Permits at 1205 Crupp Ct cover bathroom and electrical updates to a home, not a new building. The first listed permit was filed March 3, 2025, for electrical work; later permits cover a tub-to-shower conversion and tub and window replacement.
Summarized from City of Austin records · updated Jan 7, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jan 7, 2026
- since Mar 3, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- replace existing tub with new tub and surround; replace existing bathroom window
- AppliedNov 12, 2025
- IssuedJan 7, 2026
- WorkJan '26 – Jan '26
- Final inspectionJan 8, 2026
Passed final inspection Jan 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
5 projectsExpress- replace existing tub with new tub and surround; replace existing bathroom window
Express- replace existing tub with new tub and surround; replace existing bathroom window
City of Austin permitPlumbing PermitFinal- Record
- 2025-145638 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express- replace existing tub with new tub and surround; replace existing bathroom window
Express- replace existing tub with new tub and surround; replace existing bathroom window
City of Austin permitBuilding PermitFinal- Record
- 2025-145638 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express tub to shower conversion in hall bathroom replace toilet
Express tub to shower conversion in hall bathroom replace toilet
City of Austin permitPlumbing PermitFinal- Record
- 2025-057425 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express tub to shower conversion in hall bathroom replace toilet
Express tub to shower conversion in hall bathroom replace toilet
City of Austin permitBuilding PermitFinal- Record
- 2025-057425 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
1. upgrade sub-panel and breakers to include gfci breaker for garage. 2. provide panel schedule. 3. install dedicated outlet with gfci outlet and replace the disposal plug in type. 4. install additional light switch for the kitchen area with a casetta type switch with a wireless remote where the switches are located for the fan/light switch box. 5. install the correct amperage breaker breaker for the ac unit and a 2-pole 25-amp gfci type breaker for the ac condenser
1. upgrade sub-panel and breakers to include gfci breaker for garage. 2. provide panel schedule. 3. install dedicated outlet with gfci outlet and replace the disposal plug in type. 4. install additional light switch for the kitchen area with a casetta type switch with a wireless remote where the switches are located for the fan/light switch box. 5. install the correct amperage breaker breaker for the ac unit and a 2-pole 25-amp gfci type breaker for the ac condenser
City of Austin permitElectrical PermitFinal- Record
- 2025-021959 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1205 Crupp Ct
What is being built at 1205 Crupp Ct?
The permits describe home improvements, including bathroom and electrical work, rather than a new building. The listed permits were filed between March 3, 2025, and January 7, 2026.
Is a new house being built at 1205 Crupp Ct in Austin?
The records provided do not describe new home construction. They list permitted updates to an existing home.
What bathroom work is permitted at 1205 Crupp Ct?
A May 2025 permit covers converting a hall-bath tub to a shower and replacing the toilet. A November 12, 2025 building permit and January 7, 2026 plumbing permit cover replacing a tub and surround and a bathroom window.
When were permits filed for 1205 Crupp Ct?
The earliest listed permit, 2025-021959 EP for electrical work, was filed March 3, 2025. The latest listed permit, 2025-145638 PP for bathroom plumbing, was filed January 7, 2026.
What electrical work is permitted at 1205 Crupp Ct?
Permit 2025-021959 EP, filed March 3, 2025, covers panel and breaker updates, a GFCI outlet, a kitchen light switch, and work related to the air-conditioning equipment.
Also being built nearby
All of 78753- 1209 Crupp CtNov 16, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 2-ton vertical gas furnace and associated hvac components like-for-like · 44 m away
- 11826 Tobler TrlMay 28, 2024My customer wants to upgrade his electrical main service he have some issues with the actual electrical service due that the main breaker trips often. this service will be overhead and we will be replacing the branch breaker for the same kind · 66 m away
- 11906 Thompkins DrNov 15, 2023Replacement of an existing water heater · 97 m away
- 11803 Byers CvSep 3, 2026Replacement of an existing water heater water heater traditional changeout · 111 m away
- 11912 Shropshire BlvdJul 24, 2025Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 1117 Byers LnMay 29, 2024Molinar - disconnect/reconnect power to tie in pv component and upgrading msp to 200 amps. upgrading revenue meter to 200 amps · 129 m away
- 11816 Tobler TrlAug 28, 2025Replacement of an existing water heater · 135 m away
- 1306 Byers LnOct 8, 2026Installing a 40 ft main water line · 150 m away
- 11917 Shropshire BlvdFeb 10, 2026Ev install · 154 m away
- 11814 Tobler TrlNov 14, 2024Install an ev charger and doing a main panel upgrade to accomodate charger 60amp · 153 m away
- 1111 Byers LnNov 9, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 167 m away
- 12003 Captain Bailys CtNov 18, 2026Replacement of complete existing central heat and air system with or without duct work ronny reese · 208 m away